Maple Grove, MN Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger threshold
1+ acre new/reconstructed impervious
Below threshold
runoff control rules apply instead
Standard applied
city engineering design standards
Governing law
City Code § 14-71

Summary

Projects in Maple Grove that create or fully reconstruct one acre or more of impervious surface must develop a full stormwater management plan meeting the city's engineering design standards.

All projects resulting in site disturbance that creates one or more acres of new impervious surface or fully reconstructs one or more acres of impervious surface will be required to develop a stormwater management plan that meets the requirements of the city's engineering design standards. In lieu of preparation of a stormwater management plan, all land disturbing activities within the city that require a permit only required to follow the construction site stormwater runoff control requirements and are encouraged to incorporate the requirements of the city's engineering design standards.

(Code 2003, § 14-203; Ord. No. 18-08, § 1, 7-16-2018)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 6 Update 1).

Full Breakdown

City Code § 14-71 requires any project resulting in site disturbance that creates one or more acres of new impervious surface, or fully reconstructs one or more acres of impervious surface, to develop a stormwater management plan meeting the city's engineering design standards. Smaller land-disturbing projects that need a permit but fall under that acreage threshold instead only have to follow the construction site stormwater runoff control requirements, and are merely encouraged (not required) to incorporate the fuller engineering design standards.

Violations & Fines

Proceeding with a one-acre-plus impervious project without an approved stormwater management plan blocks permit issuance under § 14-68(11) and can be prosecuted as a misdemeanor under § 14-61 for failing to meet article requirements.

Frequently Asked Questions

Does every Maple Grove building permit need a full stormwater management plan?
No: only projects creating or reconstructing one acre or more of impervious surface trigger the full plan requirement under § 14-71.
What must smaller Maple Grove projects do instead of a full stormwater plan?
They must follow the construction site stormwater runoff control requirements and are encouraged to use the engineering design standards.

Sources & Official References

Other rules in Maple Grove

All Maple Grove rules

Compare Maple Grove to another location·View the Minnesota environmental rules overview

Get notified when Stormwater Management in Maple Grove, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.