Cedar Park, TX Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Alt. permit
Rough grading permit, Engineering
Default requirement
Full site development permit
Early-start penalty
2x normal permit fee
Drainage standard
Article 12.16 Stormwater Mgmt

Summary

Cedar Park requires either a full site development permit or a rough grading permit from the Engineering Department before any grading work can begin within city limits.

A rough grading permit may be issued by the Engineering Department after review by the Engineering Department (engineer) and the Development Services Department (Director of Development Services, or their designee).

(8) Any other minor site activity similar to those listed above and approved by the Development Services Department (Development Services Director). (Ordinance CO11-20-01-09-H1 adopted 1/9/20)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4973212; v14 updated 2026-06-25).

Full Breakdown

Section 14.01.002(7) lets the Engineering Department, after joint review with the Development Services Department, issue a rough grading permit as an early entry point for site work. Section 14.03.010(a) then makes clear that, except for grading covered by an approved rough grading permit, no site construction may begin until the Development Services Committee has issued a full site development permit; starting early risks a stop-work order and a penalty of twice the normal permit fee. Drainage design must separately meet Article 12.16, Stormwater Management, including the City of Austin Drainage Criteria Manual adopted by § 12.16.005.

Violations & Fines

Grading before a rough grading or site development permit issues can trigger a stop-work order and a penalty of two times the normal permit fee under § 14.03.010(a), on top of the City's general § 1.01.009 penalties.

Frequently Asked Questions

Do I need a permit to grade my lot in Cedar Park?
Yes. Either a rough grading permit from the Engineering Department (§ 14.01.002(7)) or a full site development permit is required before grading begins.
What drainage rules apply once grading starts?
Article 12.16, Stormwater Management, applies, including the City of Austin Drainage Criteria Manual adopted by § 12.16.005 for runoff, erosion, and floodplain design.

Sources & Official References

Other rules in Cedar Park

All Cedar Park rules

Texas rules heatmap·Compare Cedar Park to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Cedar Park, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.