Floyd County, IN Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Required document
Perimeter Control Plan
Minimum buffer strip width
25 feet
Stabilized entrance pad
6 inches thick, 100 feet long
Stone size required
2 to 3 inch crushed coarse stone
Pre-acceptance inspection window
Within 7 days of submission

Summary

Floyd County Code § 152.006 requires a Perimeter Control Plan on construction sites in unincorporated Floyd County to stop sediment from leaving the site before permanent controls go in, including vegetated buffer strips at least 25 feet wide and a stabilized stone pad at every construction entrance.

These county ordinances apply to unincorporated areas of Floyd County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A) The Perimeter Control Plan shall include measures to prevent sediment from leaving the site during initial disturbance activities and prior to temporary or permanent erosion prevention and/or sediment control practices. ... (D) (1) In selection of sediment control measures, the type of flow, site terrain, soil type, and other relevant factors shall be considered. Buffer strips may only be utilized for sheet flow and must be at least 25 feet in width. ... (E) (1) The Perimeter Control Plan shall address stabilizing construction entrances/exits to reduce the amount of sediment transported onto nearby roadways, and potentially into waterways. (2) (a) Where possible, traffic entering a public right-of-way, alley, sidewalk, or parking lot shall first pass over a stabilized stone pad. (b) This pad shall be at least six inches thick, 100 feet long, and contain two-inch to three-inch crushed coarse graded stone.

Full Breakdown

The Perimeter Control Plan addresses downstream outfall points while a separate Grading Plan covers site-wide erosion prevention and sediment control. It must prevent sediment from reaching adjacent properties using well-vegetated buffer strips, sediment barriers, filters, diversion berms, or sediment basins, chosen based on the type of flow, site terrain, and soil type; buffer strips can only be used for sheet flow and must be at least 25 feet wide, and if a single sediment control device proves ineffective, the site must add supplemental perimeter controls.

Every construction entrance and exit must be stabilized so vehicles pass over a stone pad at least six inches thick and 100 feet long, built from two-inch to three-inch crushed coarse graded stone, with filter fabric underneath in seasonally wet conditions or soft soils, all aimed at keeping sediment off nearby roadways and out of waterways. Outlet protection, such as rock, grouted riprap, or concrete rubble at a pipe outlet, is encouraged to prevent scour from high flow velocities. Sites under one acre can still be required to file a Perimeter Control Plan if the county deems it necessary.

007, the county inspects the site before accepting the plan, within seven days of submission and installation of the perimeter devices, and again before any grading or disturbance may proceed.

Violations & Fines

Violations of the chapter's permit and plan requirements, including failing to install or maintain the required Perimeter Control Plan measures, carry a civil penalty of up to $2,500 per offense under § 152.999, which rises 25% for each later separate offense by the same person under § 152.010, plus possible cost and attorney-fee recovery by the county.

Frequently Asked Questions

Does a small construction site need a Perimeter Control Plan?
It can. Section 152.006(G) says a plan may still be required for a site under one acre if the county decides it is necessary, even though larger sites are automatically covered.
What stops sediment from washing onto a neighboring property?
Section 152.006(C) requires well-vegetated buffer strips, sediment barriers, filters, diversion berms, or sediment basins along the lower perimeter of the site, chosen based on the flow type, terrain, and soil, to keep sediment from depositing on adjacent land.
What do construction entrances have to look like under this rule?
Section 152.006(E) requires a stabilized stone pad at least six inches thick and 100 feet long, made of two-inch to three-inch crushed coarse graded stone, with filter fabric underneath in wet conditions, so vehicles do not track mud onto public roads.
Who inspects erosion controls before work starts?
The county inspects the site under § 152.007 before accepting the Perimeter Control Plan, within seven days of the plan's submission and the installation of the perimeter devices, and land disturbance or grading cannot proceed until that inspection and approval happen.

Sources & Official References

Other rules in Floyd County

All Floyd County rules

Compare Floyd County to another location·View the Indiana environmental rules overview

Get notified when Erosion Control in Floyd County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.