Glendale, CA Environmental Rules: Erosion Control (2026)
Key Facts
- Trigger threshold
- one acre or more of soil disturbance
- Required filings
- NOI, WDID number, SWPPP
- Smaller sites
- minimum stormwater protection plan required
- Permit precondition
- grading or building permit
- On-site documents
- SWPPP kept at site at all times
- Inspection frequency
- at least monthly for permitted sites
Summary
Glendale requires any construction that disturbs an acre or more of soil to file a stormwater Notice of Intent, get a state waste discharge ID number, and prepare a Stormwater Pollution Prevention Plan before the city will issue a grading or building permit. Smaller sites still need a minimum stormwater protection plan.
No person shall commence or continue any construction activity in the city that causes the disturbance of one acre or more of soil by clearing, grading, excavation or demolition without first demonstrating to the satisfaction of the director of public works that such person has filed a 'notice of intent' to comply with the California General Permit for stormwater discharges associated with construction activity, or has obtained a waste discharge identification number from the State Water Resources Control Board and has prepared a state stormwater pollution prevention plan. ... As a condition for issuing any grading or building permit for construction activities pursuant to this section, an applicant shall incorporate into his or her construction plan, a plan for stormwater pollution prevention which plan shall effectively control stormwater pollution from such construction activities and operations. Any such stormwater pollution plan shall be subject to review and approval by the director of public works.
Full Breakdown
050 requires anyone commencing or continuing construction activity that disturbs one acre or more of soil through clearing, grading, excavation or demolition to first demonstrate to the director of public works that they have filed a Notice of Intent to comply with the California General Permit for stormwater discharges associated with construction activity, or have obtained a waste discharge identification (WDID) number from the State Water Resources Control Board and prepared a state Stormwater Pollution Prevention Plan (SWPPP). That documentation must be kept at the construction site at all times, and as a condition of the grading or building permit itself, the applicant's construction plan must incorporate a stormwater pollution prevention plan that the director of public works reviews and approves.
060 extends a lighter version of the rule to smaller sites, disturbing less than one acre: those projects need an approved plan providing minimum stormwater quality protection, implemented throughout construction. 090 spells out the paperwork the city requires before issuing a building or grading permit on a one-acre-or-larger site or a site within a larger common plan of development exceeding one acre: a copy of the NPDES permit or Notice of Intent, the WDID number, and a copy of the SWPPP itself; permit documents must stay available on site during regular business hours, and if ownership changes mid-project, the new owner must submit its own NOI and SWPPP.
140 requires one copy of the approved SWPPP, erosion and sedimentation control plan, and owner's certification to be kept on site at all times while work is in progress, available for the director of public works to verify best management practice compliance. 150(B) requires the city to inspect construction general permit sites at least once a month, and any observed violations are reported to the Regional Water Quality Control Board.
Violations & Fines
Starting or continuing soil-disturbing construction without the required Notice of Intent, WDID number and SWPPP under Section 13.42.050, or without the minimum stormwater protection plan required for smaller sites under Section 13.42.060, is a violation of Chapter 13.42 punishable under Chapter 1.20. The director of public works can issue a notice of violation or administrative order under Section 13.42.160, inspect the site, and bill the responsible party for the city's enforcement costs; sites under a construction general permit are also reported to the Regional Water Quality Control Board for violations found during the required monthly inspection.
Frequently Asked Questions
Does every construction site in Glendale need a full SWPPP?
What paperwork must be on a Glendale construction site at all times?
Can I get a Glendale grading permit without a Notice of Intent?
How often does Glendale inspect active construction sites for erosion control?
Sources & Official References
Other rules in Glendale
California rules heatmap·Compare Glendale to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.