Key Facts
- Governing chapter
- Greenwood County Code Ch. 5, §§ 6-5-1 et seq.
- Approving authority
- Soil and Water Conservation District, public works director
- Exempt
- Single-family lot work, disturbance of one acre or less
- Not exempt
- Initial development of residential subdivisions
- Corrective deadline
- 30 days after notice for disturbance over one acre
- Maximum penalty
- $1,000 fine and/or six months imprisonment
Summary
Unincorporated Greenwood County regulates erosion and sedimentation from construction under its Stormwater Management and Sediment Control Ordinance, Title 6, Chapter 5, which exempts most single-family lot work but requires an approved control plan and grading permit for larger land-disturbing activity, enforced by the Greenwood Soil and Water Conservation District.
(2)Construction or land improvement for single-family residences, accessory buildings or structures. A single-family residence property owner may subdivide or make land improvements, provided no new street is involved, on his single lot without an approved stormwater management and sediment control plan and without obtaining a grading permit. The initial development of residential subdivisions is not exempt from the provisions of this chapter. ... If violations remain uncorrected or if a stop work order is not obeyed, the violator shall be deemed guilty of a misdemeanor and upon conviction may be imprisoned for not more than six months or fined not more than $1,000.00, or both, for violation of S.C. Code 1976, § 48-13-60. Each day any such violation shall continue to exist shall constitute a separate offense.
Full Breakdown
Greenwood County Code Chapter 5, the Stormwater Management and Sediment Control Ordinance (Sec. 6-5-1 et seq.), governs erosion and sediment control for land-disturbing activity in the unincorporated county. Sec. 6-5-5 exempts several categories from the chapter's control-plan and grading-permit requirements: agricultural and silvicultural land management, single-family residence construction or land improvement on an individual lot where no new street is involved, permitted mining operations, federal and state managed lands, work within highway rights-of-way, buried utility lines, emergency repairs, and any land-disturbing activity of one acre or less.
Critically, the single-family exemption does not extend to subdivisions: Sec. 6-5-5(2) specifically states that the initial development of a residential subdivision, including roads, water, sewer, and lot grading before building permits are issued, must still comply with the chapter. For any non-exempt project, Sec. 6-5-4 applies the chapter to all unincorporated land in the county, and the Greenwood Soil and Water Conservation District board, together with the county's director of public works, act as the approving authority. Sec. 6-5-22 authorizes the enforcement authority to inspect active sites, issue an immediate stop work order if no plan has been submitted, and require corrective plan revisions when installed measures are not controlling erosion, sedimentation, or stormwater runoff effectively.
Sec. 6-5-25 further requires the owner of any disturbed area over one acre that is still causing offsite erosion or sedimentation damage to add ground cover or other protective measures within 30 days of written notice, even if the original disturbance predates the ordinance.
Violations & Fines
A land-disturbing activity carried out without an approved plan, without a grading permit, or in violation of an approved plan's erosion-control measures is a misdemeanor under Sec. 6-5-23: upon conviction, for violation of S.C. Code § 48-13-60, a violator faces up to six months' imprisonment, a fine of up to $1,000.00, or both, with each day the violation continues a separate offense. The county can also seek injunctive relief, and anyone damaged by the violation may sue civilly for those damages.
Frequently Asked Questions
Do I need an erosion control plan to build a single-family house in unincorporated Greenwood County?
What counts as a land-disturbing activity that needs a permit?
What happens if erosion from my construction site damages a neighbor's property?
Sources & Official References
Other rules in Greenwood County
Compare Greenwood County to another location·View the South Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.