Hercules, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Hercules Municipal Code Sec. 7-2.305
Plan preparer
Registered civil engineer required
Exemption threshold
Under 1/2 acre and 200 cu yd
Rainy season
October 15 to April 15
Minimum bond
$5,000 cash bond for controls
Enforcing office
Public Works Department / City Engineer

Summary

Hercules requires a Final Erosion and Sediment Control Plan, prepared by a registered civil engineer, for most grading projects near watercourses, on steep slopes, or moving substantial soil. Smaller projects can qualify for an exemption only if they meet all eight size, slope, and location thresholds under Municipal Code Sec. 7-2.305.

A Final Erosion and Sediment Control Plan, prepared by a registered civil engineer, shall be submitted unless all of the following conditions are met: The area of land disturbed is less than one-half (1/2) acre. Natural and finished slopes are less than ten percent (10%). Volume of the grading operation is less than two hundred (200) cubic yards. The storage of any soil is less than one hundred fifty (150) cubic yards. The grading operation is not within one hundred (100) feet of the centerline of any watercourse, within one hundred (100) feet of the waterline of any water body or the Bay (high tide)... The Final Erosion and Sediment Control Plan must effectively minimize soil erosion and sedimentation from the completed project site and must also provide for the control of runoff from the site.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 555, passed March 25, 2025).

Full Breakdown

Under Hercules Municipal Code Sec. 305, anyone seeking a grading permit must submit a Final Erosion and Sediment Control Plan prepared by a California-registered civil engineer unless the project meets all eight exemption criteria: disturbed area under one-half acre, finished slopes under 10%, grading volume under 200 cubic yards, stored soil under 150 cubic yards, no work within 100 feet of a watercourse centerline or the Bay high-tide line, no threat to adjacent or downstream property, no obstruction of drainage channels, and a CEQA finding of no significant impact.

The plan must follow the ABAG 'Manual of Standards for Erosion and Sediment Control Measures' (June 1981) and must name a 24-hour standby work crew available for repairs between October 15 and April 15, the City's defined rainy season. Projects that start between August 15 and October 15 and cannot finish by October 15 must file the plan by that date; work still underway from October 15 through April 15 must include the plan with every permit application. The City Engineer inspects the work under Sec.

306 and can require a cash bond of at least $5,000, or more if the engineer's own cost estimate runs higher, to guarantee installation of the plan's erosion measures under Sec. 313. Minor trenching or maintenance work can be excluded from the plan requirement only with the City Engineer's written approval.

Violations & Fines

Grading without a required Erosion and Sediment Control Plan is a permit violation: the City Engineer can suspend or revoke the grading permit and order work stopped until the plan is filed and bonded under Sec. 7-2.320 and Sec. 7-2.313. If the contractor cannot be reached or fails to install required erosion controls before a storm, the City can perform the work itself and deduct the cost from the applicant's cash bond, and bond funds tied to erosion measures are not released until the site has weathered a full rainy season.

Frequently Asked Questions

Does every grading project in Hercules need an erosion control plan?
No. Sec. 7-2.305 exempts small jobs that disturb less than one-half acre, keep slopes under 10%, move less than 200 cubic yards, store less than 150 cubic yards of soil, stay 100 feet from any watercourse or the Bay, and pose no threat to neighboring property. Projects failing any one of the eight conditions must submit a Final Erosion and Sediment Control Plan prepared by a registered civil engineer.
Who reviews and inspects the erosion control plan?
The City Engineer within the Public Works Department reviews and approves the plan under Sec. 7-2.304 and 7-2.305, and inspects installed measures under Sec. 7-2.306. The Engineer can also require investigations by a soil engineer or engineering geologist and sets the bond amount needed to guarantee the plan's construction under Sec. 7-2.313.
What happens if erosion controls fail during a storm?
Under Sec. 7-2.313, if the applicant's contractor cannot be reached or cannot perform needed repair work during a storm, the City itself installs the necessary protective measures and charges the cost against the applicant's cash bond, which must stay in place through a full October-to-April storm season before it can be released.

Sources & Official References

Other rules in Hercules

All Hercules rules

California rules heatmap·Compare Hercules to another location·View the California environmental rules overview

Get notified when Erosion Control in Hercules, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Contra Costa County handle erosion control.

Brentwood, CA
Some Restrictions
San Ramon, CA
Some Restrictions
Antioch, CA
Some Restrictions