Hollywood, FL Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- Hollywood Code of Ordinances § 6.22.C.12.i
- Required standard
- FDEP Best Management Practices
- Measures named
- Perimeter silt fence, washdown areas, inlet protection
- Reviewing body
- Development Review Committee
- Submitted with
- Drainage plan, site plan application
- Storm design standard
- 24-year, three-day storm event retention
Summary
Hollywood requires every site plan application to include an erosion and sediment control plan built to Florida Department of Environmental Protection best-management-practice standards before the Development Review Committee will process it. The requirement sits inside the drainage plan submittal for site plan review under the city's Land Development Code.
12. Drainage plan shall include the following: ... i. Erosion and sediment control plan and details per FDEP Best Management Practices, including perimeter silt fence, washdown areas and inlet protection, as applicable.
Full Breakdown
22, an application for site plan review goes to the Division of Planning and Urban Design and then to a Development Review Committee made up of representatives from Building, Community Development, Engineering, Transportation and Mobility, Planning and Urban Design, Police, Fire, Public Utilities, Public Works, and Parks, Recreation and Cultural Arts. As part of the required drainage plan submitted with that application, the applicant must include an erosion and sediment control plan and supporting details built to Florida Department of Environmental Protection (FDEP) Best Management Practices, specifically covering perimeter silt fencing, washdown areas, and inlet protection where those measures apply to the site.
The drainage plan submittal also has to show existing and proposed grades, finished floor elevations tied to NAVD 1988 and the most stringent FEMA FIRM or Broward County Future Conditions Flood Map, the direction of proposed drainage flows, delineated swales and retention areas, and a preliminary stormwater drainage report signed and sealed by a Florida-licensed professional engineer demonstrating on-site retention for a 24-year, three-day storm event, calculated to South Florida Water Management District and Broward County Chapter 27 criteria. Landscape plans must be coordinated with the drainage plan so proposed plantings do not obstruct on-site stormwater retention. 25.
Violations & Fines
There is no separate fine schedule for the erosion-control line item itself: it is enforced by rejecting an incomplete site plan application. If the Division of Planning and Urban Design finds the drainage plan submittal deficient, the applicant must supply the missing erosion and sediment control information before the Development Review Committee will advance the application, and site plan approval, and any later building permit under § 6.25, is withheld until the drainage plan package is complete.
Frequently Asked Questions
Does Hollywood require an erosion control plan for construction sites?
Who reviews Hollywood's erosion control submittal?
What happens if the erosion control plan is missing from a site plan application?
Sources & Official References
Other rules in Hollywood
Florida rules heatmap·Compare Hollywood to another location·View the Florida environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.