Huntington Park, CA Environmental Rules: Erosion Control (2026)
Key Facts
- Grading permit gate
- Disturbed area of five acres or greater: NOI and SWPPP
- Coverage window
- Demolition or start of construction until certificate of occupancy
- Off-site sediment
- Removed the same day it leaves the site
- Soil piles
- Covered until used or removed
- Enforcement
- Infraction, each day a separate offense
- Inspections
- On consent or with an inspection warrant
Summary
In the City of Huntington Park, California, Municipal Code § 7-9.09 requires every construction project to keep sediment and construction waste on site from demolition until the certificate of occupancy. Developments disturbing five acres or greater need a state stormwater notice of intent and a SWPPP before a grading permit issues.
§ 7-9.09. Requirements for construction projects. (a) No grading permit shall be issued for developments with disturbed areas of five acres or greater unless the applicant can show that: (1) a notice of intent (NOI) to comply with the State Construction Activity Storm Water Permit has been filed; and (2) a Storm Water Pollution Prevention Plan (SWPPP) has been prepared. (b) The following requirements shall apply to all projects undergoing construction in the City. The requirements set forth below shall apply at the time of demolition of an existing structure or commencement of construction and until receipt of a certificate of occupancy: (1) Sediment, construction waste and other pollutants from construction sites and parking areas, including runoff from equipment and vehicle washing at construction sites, shall be retained on the site to the maximum extent practicable. (2) Any sediments or other materials which are not retained on the site shall be removed the same day as they leave the site. ... a temporary sediment barrier shall be installed.
Full Breakdown
Section 7-9.09 sits in Chapter 7-9, Stormwater Management and Discharge, of the Huntington Park Municipal Code and applies to all projects undergoing construction in the City of Huntington Park, Los Angeles County.
Subsection (a) is a grading permit gate. No grading permit issues for developments with disturbed areas of five acres or greater unless the applicant shows that a notice of intent to comply with the State Construction Activity Storm Water Permit has been filed and a Storm Water Pollution Prevention Plan has been prepared.
Subsection (b) runs from demolition of an existing structure or commencement of construction until receipt of a certificate of occupancy. During that window, sediment, construction waste and other pollutants, including runoff from equipment and vehicle washing, must stay on the site to the maximum extent practicable. Anything that leaves the site must be removed the same day, and the City Engineer and/or Building Official can require a temporary sediment barrier. Plastic covering is allowed on an emergency basis only, paired with runoff devices that intercept and safely convey the runoff. Excavated soil must be placed to minimize sediment running into the street or onto adjoining properties, and soil piles stay covered until the soil is used or removed. Washing construction or other industrial vehicles adjacent to a construction site is prohibited. Drainage controls are required as needed for the grading and topography, and the listed options are detention ponds, sediment ponds, infiltration pits, dikes, filter berms, ditches, down drains, chutes and flumes.
Subsection (c) lets the City condition a construction permit on reasonable limits on clearing of vegetation, including how long soil can stay bare and, in certain sensitive cases, a ban on bare soil. Subsection (d) points owners and developers to the Construction Best Management Practices Handbook published by the Storm Water Quality Task Force. Fees for plan checking and monitoring are set by City Council resolution under § 7-9.10.
Violations & Fines
A violation of § 7-9.09 is an infraction punishable as provided in § 1-2.01, and each day a violation occurs is a separate offense. Section 1-2.01 sets infraction fines at $50 for a first conviction, $100 for a second within one year, and $250 for a third or later within one year, unless the Code or a Council resolution provides otherwise. Under subsection (h) the violation is a public nuisance and the City Attorney is authorized to abate it by civil action. Penalties and remedies are cumulative.
Frequently Asked Questions
When must a project in the City of Huntington Park file a SWPPP?
How fast must sediment that leaves a Huntington Park construction site be cleaned up?
Can contractors wash trucks next to the site?
Can the City limit how long soil stays bare?
Sources & Official References
Other rules in Huntington Park
California rules heatmap·Compare Huntington Park to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Los Angeles County handle erosion control.