Snohomish County, WA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
SCC 30.63A.450
Applies to
All new development/redevelopment, any size
Wet-season limitation
October 1 to April 30
Trigger for corrective action
Turbid water leaving the site
Exemptions
100% on-site infiltration; routine BMP repair; utility maintenance
Enforcing agency
Snohomish County Public Works

Summary

Unincorporated Snohomish County requires every new development and redevelopment project, regardless of size, to control soil erosion and sediment discharge into receiving waters through a Stormwater Pollution Prevention Plan (SWPPP) approved before construction begins.

City-specific rules exist: Edmonds, Everett, Lynnwood, and Marysville have their own erosion control rules that differ from Snohomish County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

(2) Applicants for all new development and redevelopment projects of any size shall be responsible for preventing soil erosion and the discharge of sediment and pollutants into receiving waters. A SWPPP must be submitted as part of the stormwater site plan. The SWPPP shall be implemented prior to initial soil disturbance through final stabilization. ... (4) All new development and redevelopment shall be designed to prevent erosion and discharge of sediment and other pollutants into receiving waters. If erosion and sediment control requirements are not met (i.e. turbid water is leaving the site), then the department shall require that the contractor maintain the existing BMPs or implement other BMPs as appropriate. (5) To control sediment transport and erosion during the wet season from October 1st through April 30th, seasonal work limitations shall apply, except as otherwise exempt per subsection (6) of this section.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through legislation passed August 12, 2026).

Full Breakdown

450 makes the applicant for any new development or redevelopment project responsible for preventing soil erosion and the discharge of sediment and pollutants into receiving waters, no matter the project's size. A SWPPP must be submitted as part of the stormwater site plan, with a narrative and drawings describing when and where erosion and sediment control best management practices (BMPs) will be installed, the performance expected, and the corrective actions if that performance is not met. The SWPPP must be implemented before initial soil disturbance and stay in effect through final stabilization of the site.

During the wet season, from October 1 through April 30, the county imposes seasonal work limitations on land-disturbing activity: work is allowed only if the applicant demonstrates to the Snohomish County Department of Public Works' satisfaction that turbid water will be kept from leaving the site, based on existing vegetative cover, slope, soil type, proximity to receiving waters, limits on the extent of disturbed area, and the proposed erosion and sediment control measures. The county's Drainage Manual, incorporated by reference, sets the specific BMP design standards used to meet these requirements.

If turbid water is found leaving a site because erosion and sediment controls are not being met, the department can order the contractor to maintain the BMPs already installed or add new ones. Three narrow activities are exempt from the wet-season limitation: sites where stormwater runoff achieves 100 percent on-site infiltration into approved, installed facilities; routine maintenance and necessary repair of existing erosion and sediment control BMPs; and routine maintenance of public facilities or utility structures that does not expose soil or strip vegetative cover.

The section was most recently amended by Ordinance 26-021 (June 17, 2026, effective July 1, 2026), following earlier amendments in 2010, 2016 and 2021 that reorganized the SWPPP element sections referenced in this part of the chapter.

Violations & Fines

Enforcement runs through the Snohomish County Department of Public Works (Surface Water Management). Inspectors treat turbid water leaving a construction site as evidence the SWPPP's erosion and sediment controls have failed, and can order the contractor to maintain existing BMPs or install additional ones on the spot. Continuing land-disturbing work during the October 1 through April 30 wet season without meeting the seasonal limitation showing, or without a qualifying exemption, is a code violation subject to stop-work action and correction under the county's Drainage Manual standards.

Frequently Asked Questions

Does every construction project in unincorporated Snohomish County need an erosion control plan?
Yes. SCC 30.63A.450(2) applies to new development and redevelopment projects of any size and makes the applicant responsible for preventing soil erosion and sediment discharge. A SWPPP with erosion and sediment control BMPs must be part of the stormwater site plan submitted before any soil disturbance begins.
Can I clear or grade land in the winter in Snohomish County?
Only if you can show the county that turbid runoff will be kept on site. SCC 30.63A.450(5) imposes seasonal work limitations from October 1 through April 30, based on vegetative cover, slope, soil type, and the erosion controls proposed, unless the work falls under one of the section's narrow exemptions.
What happens if my site is discharging muddy water during construction?
Turbid water leaving the site is treated as noncompliance under SCC 30.63A.450(4). The county's Public Works department can require the contractor to maintain the BMPs already in place or implement additional erosion and sediment control measures until the discharge stops.

Sources & Official References

Other rules in Snohomish County

All Snohomish County rules

Compare Snohomish County to another location·View the Washington environmental rules overview

Get notified when Erosion Control in Snohomish County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Snohomish County