Skip to main content
CityRuleLookup

Pima County, AZ Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
Unincorporated Pima County only
Reviewing body
Pima County Regional Flood Control District
Trigger
Any subdivision or development grading
Pre-requisite
Grading plan submitted and approved first

Summary

Unincorporated Pima County requires Flood Control District review and approval of a grading plan before any site grading or drainage work on a subdivision or development.

City-specific rules exist: Sahuarita, and Tucson have their own erosion control rules that differ from Pima County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

District review and approval are required prior to commencement of any site improvements or grading associated with a subdivision development as a whole or for individual lot(s) within the subdivision. A grading plan must be submitted to the District for review and approval. Detailed improvement plans for storm drains or channel improvements must also be submitted to the District for review and approval. Where a grading plan or detailed drainage improvement plans are not provided, the Chief Engineer may require additional information and engineering plans prior to issuing a floodplain use permit. Certifications of elevation shall be required pursuant to

Source: Pima County RFCD Drainage Design ManualView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-64: Contains Supplement, with local legislation through Ordinance 2026-9, passed 7-28-2026, current through 7-28-2026).

Full Breakdown

In the unincorporated county (not Tucson, Marana, Oro Valley, Sahuarita or South Tucson), the Regional Flood Control District must review and approve a grading plan before any site improvements or grading begin on a subdivision or development, whether for the whole project or an individual lot. Detailed improvement plans for storm drains or channel improvements also go to the District, and the chief engineer can require added engineering information before issuing a floodplain use permit.

Violations & Fines

Grading or site improvements started without District plan approval violate Pima County Code Title 16; the chief engineer can withhold the floodplain use permit and building permits until as-built drainage plans are submitted and approved.

Frequently Asked Questions

Do I need District approval before grading my lot in unincorporated Pima County?
Yes, if the lot is part of a subdivision or development plan; the District must approve a grading plan before site improvements or grading begin.
Does this rule apply inside Tucson?
No. Tucson, Marana, Oro Valley, Sahuarita and South Tucson enforce their own codes, not this county chapter.

Sources & Official References

Other rules in Pima County

All Pima County rules

Compare Pima County to another location·View the Arizona environmental rules overview

Get notified when Erosion Control in Pima County, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Pima County