Lewisville, TX Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Erosion controls required
Silt fence, barricades before work starts
High-erosion standard
Wire-backed silt fencing required
Backfill compaction
95% standard proctor density
Scope
Right-of-way excavation/installation work
Cross-referenced rule
City stormwater pollution prevention ordinance

Summary

Contractors working in a Lewisville public right-of-way must have erosion control measures, such as silt fencing, in place before construction begins under Section 13-40(c), and the owner stays responsible for stormwater management and excavation safety for the life of the project.

Erosion control measures (e.g., silt fence) and advance warning signs, markers, cones, and barricades must be in place before work begins. Owner shall be responsible for stormwater management, erosion control, and excavation safety measures that comply with city, state, and federal guidelines. Requirements shall include, but not be limited to, construction fencing around any excavation that will be left overnight, silt fencing in erosion areas until reasonable vegetation is established, and barricade fencing around open holes. High erosion areas will require wire backed silt fencing. Upon request owner may be required to furnish documentation submitted or received from federal or state government.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Unified Development Code: Supplement 3 | Code of Ordinances: Supplement 34 Update 1).

Full Breakdown

Section 13-40 sets the construction standards that apply to any permitted work in a Lewisville public right-of-way, and subsection (c) is the erosion control rule: silt fencing and other erosion-control measures, along with advance warning signs, markers, cones and barricades, must be in place before work begins, and the owner is responsible for stormwater management, erosion control and excavation safety for the duration of the project. The section spells out minimums: construction fencing is required around any excavation left open overnight, silt fencing must stay up in erosion-prone areas until vegetation is reasonably established, and open holes need barricade fencing.

High-erosion areas carry a stricter standard, wire-backed silt fencing rather than ordinary silt fence, and the city can demand documentation the owner submitted to or received from state or federal regulators. Subsection (w) folds in a second layer of control, requiring compliance with the city's separate stormwater pollution prevention ordinance in any area of potential erosion. Related provisions in the same section address soil stability during construction: trenches must be backfilled and mechanically tamped in six-inch lifts to restore original grade, with density testing to 95 percent standard proctor compaction where required, and pumped water or mud from a work site must be contained under state and federal law.

These rules apply specifically to right-of-way excavation and installation work regulated under Article II of Chapter 13; Lewisville's general private-site construction and stormwater standards are set out in a separate development code not reproduced in this chapter.

Violations & Fines

Failing to install erosion control before work begins, or letting silt fencing or barricades lapse during construction, is a violation of the Section 13-40 permit conditions; the responsible person can halt work, require additional restoration under Section 13-49, and bill the owner for any city cleanup, on top of prosecution under the Code's general penalty in Section 1-15.

Frequently Asked Questions

What erosion control does Lewisville require before right-of-way construction starts?
Section 13-40(c) requires silt fencing and other erosion-control measures, plus warning signs, markers, cones and barricades, to be installed before any work begins in a public right-of-way. The owner stays responsible for stormwater management and excavation safety for as long as the project is active, not just at the start.
Is there a stricter rule for areas that erode easily?
Yes. Section 13-40(c) requires wire-backed silt fencing, a heavier-duty product than standard silt fence, in high-erosion areas. The city can also require the owner to produce any erosion-related documentation it filed with or received from state or federal agencies for the project.
Does this erosion control rule apply to a homeowner's backyard construction project?
No. Section 13-40 sits in Chapter 13's right-of-way management article and governs excavation and facility installation within the public right-of-way itself, not private-lot construction. Lewisville's general standards for grading and drainage on private development sites are set out in a separate development code.

Sources & Official References

Other rules in Lewisville

All Lewisville rules

Texas rules heatmap·Compare Lewisville to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Lewisville, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Denton County handle erosion control.

Denton, TX
Some Restrictions
Flower Mound, TX
Some Restrictions