Merced, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Sec. 15.50.120(B), Storm Water Management chapter
Minimum requirement
BMPs for erosion, sediment control, dewatering, all sizes
Large sites
Submit WDID number and SWPPP before permit issuance
Small sites
Under 1 acre: submit erosion and sediment control plan
Post-construction duty
Recorded O&M agreement for permanent control measures

Summary

Every construction project in Merced with soil disturbance exposed to stormwater must install erosion and sediment control best management practices under Municipal Code Sec. 15.50.120(B)(1). Projects under an acre that fall outside the state's Construction General Permit still owe the city an erosion and sediment control plan before grading begins.

Any person performing construction activities in the city shall prevent pollutants from entering the storm water conveyance system and comply with all applicable federal, state and local laws, ordinances, or regulations, including, but not limited to, the current California NPDES General Permit for storm water discharges associated with construction activity (Construction General Permit) and the city storm water management and discharge control chapter. All construction projects, regardless of size, having soil disturbance or activities exposed to storm water must, at a minimum, implement BMPs for erosion and sediment controls, soil stabilization, dewatering, source controls, pollution prevention measures, and prohibited discharges.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 85 - 1-26).

Full Breakdown

Sec. 120(B) of the Storm Water Management and Discharge Control chapter sets Merced's erosion-control standard for builders. ' Larger sites covered by the state's Construction NPDES General Permit must give the city their Waste Discharge Identification (WDID) number and Storm Water Pollution Prevention Plan (SWPPP) before the city issues a construction permit or approves improvement plans, under Sec. 120(B)(2). Smaller sites, those disturbing less than an acre and not subject to the state general permit, instead submit a simpler erosion and sediment control plan to the city.

Post-construction, Sec. 120(C) lets the enforcement official require permanent controls, such as source control measures, treatment controls, or hydromodification measures sized to the city's Storm Water Design Standards Manual, and developers must sign a recorded operation and maintenance agreement binding them, and later owners, to keep those measures working. Sec. 140 gives the city a right of entry to inspect erosion-control compliance, and Sec. 185 makes any violation of the chapter, including a failure to control erosion, a misdemeanor with each day of noncompliance a separate offense.

Violations & Fines

Failing to implement required erosion and sediment control BMPs is a misdemeanor under Sec. 15.50.185, with each day of the violation charged separately. The enforcement official can withhold approval of a building or grading permit until proof of Construction General Permit compliance or an erosion control plan is submitted under Sec. 15.50.120(B), and can order emergency abatement of an active erosion or sediment discharge within 72 hours under Sec. 15.50.165, with cleanup costs billed to the property owner.

Frequently Asked Questions

Does every construction site in Merced need an erosion control plan?
Yes, at some level. Sec. 15.50.120(B)(1) requires all construction projects with soil disturbance, regardless of size, to implement BMPs for erosion and sediment control. Sites big enough to trigger the state's Construction General Permit submit their WDID number and SWPPP to the city; smaller sites under an acre instead submit a simpler erosion and sediment control plan before the city issues a permit.
Does erosion control still apply after construction ends?
Yes. Under Sec. 15.50.120(C), the enforcement official can require permanent post-construction controls for new development, and the project proponent must sign a recorded operation and maintenance agreement to keep those measures, such as treatment controls or hydromodification measures, working after the property is sold. The city can also require annual self-certification that the controls are being maintained.
Who reviews erosion control compliance on a Merced building site?
The city engineer and the enforcement official administer Sec. 15.50.120 and can enter a site to inspect under Sec. 15.50.140's right-of-entry authority, take samples, and require monitoring and reporting of any discharge from the site. Proof of Construction General Permit compliance can be demanded before a building permit, grading permit, or improvement plan is approved, and again during any enforcement action.

Sources & Official References

Other rules in Merced

All Merced rules

California rules heatmap·Compare Merced to another location·View the California environmental rules overview

Get notified when Erosion Control in Merced, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.