Skip to main content
CityRuleLookup

Merced, CA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

AE/AH zone standard
Lowest floor at or above BFE
AO zone standard
Above grade by map depth or 2 ft
Nonresidential alternative
Dry floodproofing to base flood level
Vent opening rule
1 sq in per sq ft, under 1 ft above grade
Certification required
Registered engineer, surveyor, or inspector

Summary

New construction and substantial improvements in Merced's AE and AH flood zones must have the lowest floor, including any basement, elevated to or above the base flood elevation shown on FEMA's flood insurance rate map. Section 17.48.140.C.1 requires a registered engineer, surveyor, or the city building inspector to certify that elevation before the city engineer will sign off on the project.

1.New construction and substantial improvement in zones AE and AH shall have the lowest floor, including basement, elevated to or above the base flood elevation. Nonresidential structures may meet the standards in subsection C.3. hereof. Upon the completion of the structure the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, or verified by the community building inspector to be properly elevated. Such certification or verification shall be provided to the city engineer.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 85 - 1-26).

Full Breakdown

140 sets the actual construction standards under Merced's floodplain chapter. For Zones AE and AH, the elevation rule is a hard floor: the lowest floor of a new or substantially improved structure, including any basement, must sit at or above the base flood elevation shown on the FEMA flood insurance rate map, and a registered professional engineer or surveyor, or the city's building inspector, must certify the as-built elevation to the city engineer before the project is considered compliant. In Zone AO, where FEMA maps a depth number instead of a BFE, the standard shifts to elevating the lowest floor above the highest adjacent natural grade by whatever depth is shown on the map, or at least two feet if no depth number is listed.

3: instead of elevating, they may be dry-floodproofed watertight below the flood level with walls and structural components capable of resisting hydrostatic and hydrodynamic loads, certified by a registered engineer or architect. 4, meaning at least two openings totaling one square inch of net area for every square foot of enclosed space, with the bottom of every opening no higher than one foot above grade. 5. 040, separately defines 'freeboard' as a safety margin above the calculated flood level that compensates for unknowns like wave action, but Merced's construction standard itself sets the floor at the base flood elevation rather than layering an additional freeboard requirement on top of it.

Violations & Fines

Completing new construction or a substantial improvement in a mapped flood zone without the required elevation certification is a violation under Section 17.48.070, punishable as a misdemeanor, and Section 17.48.130 has the city engineer withhold occupancy sign-off until a registered engineer, surveyor, or building inspector certifies the as-built lowest-floor elevation meets or exceeds the base flood elevation.

Frequently Asked Questions

How high must I build above the flood level in Merced?
In Zones AE and AH, Section 17.48.140.C.1 requires the lowest floor, including any basement, to be elevated to or above the base flood elevation shown on the FEMA flood insurance rate map. In Zone AO, the floor must sit above the highest adjacent grade by the map's stated depth number, or two feet if none is listed.
Can a commercial building in Merced skip elevating above the flood level?
Yes, if it's nonresidential. Section 17.48.140.C.3 lets nonresidential structures be dry-floodproofed instead, meaning the building is watertight below the base flood level and its walls and structural components can resist hydrostatic and hydrodynamic loads, certified by a registered engineer or architect to the city engineer.
What certification does Merced require after elevating a flood-zone structure?
A registered professional engineer or surveyor must certify the as-built lowest-floor elevation, or the city's community building inspector must verify it, and that certification goes to the city engineer under Section 17.48.140.C.1 before the project is considered compliant with the chapter.

Sources & Official References

Other rules in Merced

All Merced rules

California rules heatmap·Compare Merced to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Merced, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.