Oconee County, SC Environmental Rules: Erosion Control (2026)
Key Facts
- Overlay area
- Within 750 ft of full pond contour
- Silt fence trigger
- Required before zoning inspection
- Keowee elevation
- 800 ft above MSL
- Jocassee elevation
- 1,100 ft above MSL
- Buffer distance
- 25 ft from full pond contour
- Enforcement
- Fine/imprisonment, permit revocation, stop-work orders
Summary
Within 750 feet of Lake Keowee or Lake Jocassee's full pond contour, Oconee County's Lake Overlay District requires an entrenched silt fence before a zoning inspection can happen, with added measures like hay bales or seeding if silt still reaches the buffer, under Section 38-11.1(d)(1)a.5(v).
Silt fences: In order to ensure that the natural vegetative buffer is maintained during the development of property, properly installed, entrenched and maintained silt fences are required, before a zoning inspection will take place. The silt fences must begin at or above the vegetative buffer line. Wire backed silt fences are highly recommended and J-hooks, hay bales, grass mats and seeding shall be installed, as needed, at least 25 feet from the full pond contour (800 feet above MSL for Keowee and 1,100 feet above MSL for Jocassee), separating the buffer from the developed area, until the completion of construction. The county may mandate additions of any or all of these options at any point during construction.
Full Breakdown
1 creates the Keowee/Jocassee Overlay, layered on top of the base zoning district within 750 feet of the full pond contour of Lake Keowee and Lake Jocassee. 5(v) requires a properly installed, entrenched and maintained silt fence on a construction site before the county will conduct a zoning inspection, and the silt fence has to begin at or above the line of the required natural vegetative buffer. Wire-backed silt fences are highly recommended, and the county can require J-hooks, hay bales, grass mats and seeding as needed, placed at least 25 feet from the full pond contour, which the ordinance fixes at 800 feet above mean sea level for Lake Keowee and 1,100 feet above mean sea level for Lake Jocassee, separating the vegetative buffer from the area under construction until the work is finished.
If silt or debris does get into the buffer despite those measures, the county requires the responsible party to add further control measures promptly, and any silt that has entered the buffer must be removed where possible and the disturbed area re-stabilized with pine straw, mulch or planted vegetation. The requirement sits inside the broader 25-foot natural vegetative buffer standard that applies to waterfront parcels within 25 feet of the full pond contour, and the whole overlay is enforced with its own penalty clause rather than folding into the general zoning penalty.
Violations & Fines
Subsection (f) of Section 38-11.1 sets its own penalty for the Lake Overlay District: a fine and/or imprisonment up to the jurisdictional limits of an Oconee County magistrate's court. The county can also revoke building and zoning permits, issue stop-work orders and levy civil fines, and the provisions of the International Property Maintenance Code may apply on top of that.
Frequently Asked Questions
Do I need a silt fence to build near Lake Keowee?
What if silt still washes into the buffer despite my fence?
What happens if I skip the silt fence requirement?
How are the lake elevations defined for the buffer measurement?
Sources & Official References
Other rules in Oconee County
Compare Oconee County to another location·View the South Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.