Skip to main content
CityRuleLookup

Olathe, KS Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit required
Before any grading begins
Small-project exemption
Under 1 acre, under 50 cu. yd.
Permit validity
2 years from issuance
Enforcing office
City Engineer, Public Works

Summary

Olathe requires a land disturbance permit before any grading begins; small projects disturbing under an acre, with minimal fill and no drainageway obstruction, are exempt from the permit requirement.

(A) No person is allowed to initiate any grading or other land disturbance activity without first obtaining a land disturbance permit. ... (1) Land disturbance activities that cumulatively disturb less than one (1) acre, and are not part of a larger common plan of development or sale which disturbs a cumulative area of one (1) acre or more, and involves fill of less than three (3) feet in height, and containing less than fifty (50) cubic yards, and does not create a slope in excess of three (3) horizontal to one (1) vertical, and does not obstruct a drainageway.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 26-39, passed July 21, 2026).

Full Breakdown

Olathe Municipal Code § 17.12.050 bars anyone from starting grading or other land disturbance without a City-issued land disturbance permit, which the City Engineer can grant for grading alone before a full stormwater management plan is submitted. Section 17.12.060 exempts activities that cumulatively disturb less than one acre (outside a larger common development), involve less than three feet of fill, under 50 cubic yards, no slope steeper than 3:1 horizontal-to-vertical, and that don't obstruct a drainageway, plus emergency repair work, agricultural uses, and disturbance already covered under a building permit's erosion control plan. A standard permit stays valid for two years.

Violations & Fines

Grading without a required Land Disturbance Permit violates Title 17 and is a misdemeanor punishable by up to a $500 fine; the City can also pursue injunctions or abate the violation as a nuisance (§17.02.110).

Frequently Asked Questions

Do I need a permit to grade my Olathe lot?
Yes, unless the work is exempt: under Municipal Code § 17.12.060, disturbing less than an acre with under 50 cubic yards of fill and no drainageway obstruction doesn't need one.
How long is an Olathe land disturbance permit good for?
Two years from the date of issuance, per § 17.12.050; after that, the applicant has to reapply for a new permit.

Sources & Official References

Other rules in Olathe

All Olathe rules

Compare Olathe to another location·View the Kansas environmental rules overview

Get notified when Erosion Control in Olathe, KS changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Johnson County handle erosion control.

Overland Park, KS
Some Restrictions