Skip to main content
CityRuleLookup

Olympia, WA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Governing sections
Olympia Municipal Code §§ 13.16.017 and 13.16.018
Adopted standard
Drainage Design and Erosion Control Manual
First civil infraction
Class 3 ($50) per day
Third civil infraction
Class 1 ($250)
Clearing permit expiry
One year, one 6 month extension
Work before permit
Application penalty fee triple the regular fee
Appeal window
Fourteen calendar days to the Hearing Examiner

Summary

In the City of Olympia, Washington, Olympia Municipal Code § 13.16.017 adopts the Drainage Design and Erosion Control Manual by reference, and § 13.16.018 makes the Manual prevail over conflicting ordinances, standards and policies. Violating § 13.16.017 is a civil infraction starting at $50, and each day is a separate infraction.

The City of Olympia Drainage Design and Erosion Control Manual (“the Manual”), as amended and updated, is adopted by reference as though fully set forth in this chapter. One copy of the Manual must be placed and held in the office of the City Clerk and be available to the public. ... The provisions of the Drainage Design and Erosion Manual adopted in OMC 13.16.017 control and prevail over any provisions of current ordinances, development standards, or policies insofar as a conflict may occur.

Full Breakdown

Erosion and sediment control in the City of Olympia runs through a technical manual that the code adopts as law. Section 13.16.017 adopts the City of Olympia Drainage Design and Erosion Control Manual, as amended and updated, by reference as though fully set forth in chapter 13.16. One copy must be held in the office of the City Clerk and be available to the public. Section 13.16.018 makes the Manual control and prevail over any provisions of current ordinances, development standards or policies insofar as a conflict occurs. Under § 13.16.020, the owner of a parcel must apply to the Community Planning and Development Department for an engineering permit before stormwater is discharged to the storm drainage system, and the Manual governs the permit terms and conditions.

The clearing ordinance in chapter 16.48 adds site-level requirements. A clearing permit application must include a plot plan showing property boundaries, the extent of proposed clearing, buffer areas and the location and description of proposed erosion-control devices or structures under § 16.48.060(A). The building official decides within 20 working days of a completed application. A permit expires one year from issuance, with one extension of 6 months for good cause. Under § 16.48.060(D), an application penalty fee triple the regular fee applies to any grading or clearing done before the permit is issued. Section 16.48.050 exempts several cases, including emergency clearing for immediate danger to life or property and clearing on a parcel under 7,000 square feet for a single-family or duplex residence, except within 300 feet of critical areas.

One of the stated purposes in § 16.48.020 is to ensure prompt restoration, replanting and effective erosion control of property after land clearing and grading. Section 16.48.070 lets the building official require performance bonds, and under § 16.48.090 an aggrieved person has fourteen calendar days to appeal to the Hearing Examiner.

Violations & Fines

Under § 13.16.180, violating § 13.16.017, 13.16.020, 13.16.030 or 13.16.040 is a civil infraction with each day a separate infraction: first offense Class 3 ($50), second Class 2 ($125), third Class 1 ($250), plus statutory assessments. These sections are also declared a public nuisance. Under § 16.48.120, a knowing clearing violation is a misdemeanor with a fine up to $1,000, up to ninety days in jail, or both.

Frequently Asked Questions

What erosion control standard applies in the City of Olympia?
The Drainage Design and Erosion Control Manual. Section 13.16.017 adopts it by reference as though fully set forth in the chapter, as amended and updated, and § 13.16.018 makes it control over conflicting ordinances, development standards and policies. A copy is held in the office of the City Clerk.
What is the penalty for violating the Manual requirement?
Section 13.16.180 makes it a civil infraction to violate § 13.16.017, with each day a separate infraction. The first offense is Class 3 ($50), the second arising from the same facts is Class 2 ($125), and the third is Class 1 ($250), not including statutory assessments. It is also a public nuisance.
Do I need a permit before clearing land in Olympia?
Yes, unless exempt. Section 16.48.040 bars land clearing without an approved Tree, Soil and Vegetation Plan and tree removal permit, a grading permit from the Building Official, or approval under § 16.48.050. The application plot plan must show proposed erosion-control devices, and the decision comes within 20 working days.
What happens if I clear before getting the permit?
Section 16.48.060(D) assesses an application penalty fee triple the regular fee for grading or clearing conducted before the permit issues, in addition to any penalty under § 16.48.120. That section makes a knowing violation a misdemeanor with a fine up to $1,000, up to ninety days in jail, or both.

Sources & Official References

Other rules in Olympia

All Olympia rules

Compare Olympia to another location·View the Washington environmental rules overview

Get notified when Erosion Control in Olympia, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.