Oneida County, WI Environmental Rules: Erosion Control (2026)
Key Facts
- Requires
- Design to minimize soil erosion, manage drainage
- Committee power
- May require engineering studies of erosion
- Also cross-referenced
- Wis. Admin. Code NR 151, NR 216
- Jurisdiction
- Unincorporated towns only, not Rhinelander or villages
- Help available from
- County Land and Water Conservation Department
Summary
Every new Oneida County land division must be designed to minimize soil erosion and manage surface water drainage under General Code § 15.22(1), and the Planning and Zoning Committee can demand engineering studies and impose preventive design requirements before approving a plat. The rule reaches unincorporated towns only, not Rhinelander or a village.
Land divisions shall be designed so as to minimize soil erosion and to provide reasonable management of surface water drainage. The Committee may require engineering studies of erosion potentials and may impose preventive design requirements. The Committee may require documentation of surface water drainage patterns and may impose design requirements to assure that flows are transported and disposed of without causing undue erosion and siltation of surface waters, undue runoff onto adjoining lands, roads, or other rights-of-way or excessive infiltration into locations of on-site wastewater disposal facilities. Subdividers may request assistance from the Department and the Oneida County Land and Water Conservation Department in meeting the above requirements. Subdivision of lands may be subject to provisions found in Wis. Adm. Code NR 151 and NR 216.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4929683; v20 updated 2026-04-21; through 04-21-2026).
Full Breakdown
22(1), the lead subsection of Surface Drainage and Erosion Control in Article III of the Subdivision Control Ordinance, requires that land divisions be designed so as to minimize soil erosion and to provide reasonable management of surface water drainage. It hands the Committee two specific powers: it may require engineering studies of erosion potentials and may impose preventive design requirements, and it may require documentation of surface water drainage patterns and impose design requirements to keep flows from causing undue erosion and siltation of surface waters, undue runoff onto adjoining land, roads or rights-of-way, or excessive infiltration into private on-site wastewater disposal sites.
The section directs subdividers who need help meeting those standards to the Department and the Oneida County Land and Water Conservation Department, and it flags that a subdivision may separately be subject to Wis. Admin. Code NR 151 and NR 216, the state's agricultural and construction-site stormwater rules. 22(2) requires a stormwater easement or drainage right-of-way wherever a subdivision is crossed by a watercourse. 09, Chapter 15's jurisdiction applies to all lands within Oneida County except within the corporate limits of any incorporated area, so this erosion-control design standard governs new land divisions in the towns, not plats platted inside the City of Rhinelander or a village. 04(4)(a)1.
Violations & Fines
A § 15.22(1) design-standard violation is cited under Chapter 25's general enforcement scheme by the Planning and Zoning Director, Assistant Planning and Zoning Director, Land Use Specialists or Zoning Technicians per § 25.04(4)(a)1, with forfeitures set by § 25.04(1) at $5 to $500 for a first offense and $10 to $500 for a second.
Frequently Asked Questions
Can Oneida County require an engineering study for erosion on my subdivision?
Does state stormwater law apply on top of this county rule?
Where can I get help meeting the erosion-control design standard?
Sources & Official References
Other rules in Oneida County
Compare Oneida County to another location·View the Wisconsin environmental rules overview