Palm Coast, FL Environmental Rules: Erosion Control (2026)
Key Facts
- Cleanup deadline
- 15 days after noncompliance notice
- Vegetated buffer option
- At least 8 feet wide, undisturbed
- Bulkhead backfill deadline
- 30 days after construction/repair
- Standards referenced
- FDEP 2007/2008 erosion control manuals
- Governing section
- City Code § 24-76
Summary
Palm Coast requires Best Management Practices to keep construction sites from eroding into the city's canals, ditches, lakes and other waterbodies. Sec. 24-76 makes it a violation to let construction material erode into a waterbody and not remove it within 15 days of notice, and it requires erosion control measures like an eight-foot vegetated buffer or a staked filter cloth screen.
(b)Violations. It shall be a violation:(2)To allow material from a construction site to be deposited or to erode into a waterbody, and fails to remove same within 15 days after notification of noncompliance. ... (d)Methods to prevent erosion. Persons involved in the construction, remodeling or repair of buildings and/or pools in the City shall use Best Management Practices to prevent erosion of surface soil into adjoining water bodies. Best Management Practices shall be designed in accordance with the State of Florida Erosion and Sediment Control Designer and Reviewer Manual (June 2007) and the Florida Stormwater, Erosion, and Sedimentation Control Inspector's Manual (FDEP July 2008) and shall be shown on the "Grading and Drainage Plan" or on a separate "Erosion Control Plan". (1)A strip of vegetated land not less than eight-feet wide shall be left undisturbed on the site adjacent to a waterbody, as defined in subsection (a) above;(2)In the rear or side yard leading to a waterbody, a properly staked and installed filter cloth screen across the lot line shall be maintained until the lot has been sodded and landscaped;
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 44 | Land Development Code: Supplement 18).
Full Breakdown
Chapter 24, Article II, Division 2 of the Palm Coast Code addresses erosion control for property adjoining a waterbody, defined at Sec. 24-76(a) to include fresh and salt water canals, ditches, lakes, marshes, rivers, swamps and swales in the city. Subsection (b) lists five specific violations: dumping vegetative material or yard clippings into a waterbody; allowing construction-site material to be deposited or to erode into a waterbody and failing to remove it within 15 days after notification of noncompliance; allowing hazards to project or hang into a waterbody; a contractor's failure to backfill a bulkhead within 30 days of construction or repair; and discharging human waste into a waterbody from shore or a watercraft.
Subsection (d) requires anyone constructing, remodeling or repairing a building or pool in the city to use Best Management Practices, designed to the state's 2007 Erosion and Sediment Control Designer and Reviewer Manual and the FDEP's 2008 Stormwater, Erosion, and Sedimentation Control Inspector's Manual, and shown on a Grading and Drainage Plan or separate Erosion Control Plan. The contractor or owner may choose among several approved methods on side and rear yards leading to a waterbody: leaving an undisturbed vegetated strip at least eight feet wide, installing a staked and maintained filter cloth screen across the lot line until the lot is sodded and landscaped, or using bales of straw or hay, unless the city directs otherwise.
Subsection (f) adds seawall- and bulkhead-specific timing: if building construction starts within 90 days, backfill must reach the top of the seawall with a swale at least five feet back to catch eroded material, and the site must be sodded on completion of final grade; if construction will not start within 90 days, the site must be left with minimal clearing and adequately sized erosion control devices until it is developed.
Violations & Fines
Letting construction material erode or be deposited into a waterbody and not removing it within 15 days of a noncompliance notice is a specific violation under Sec. 24-76(b)(2), as is failing to backfill a bulkhead within 30 days of construction or repair (b)(4) or dumping vegetative material or yard waste directly into a waterbody (b)(1). Temporary construction runoff basins and City-approved special exceptions are excluded from these violations under Sec. 24-76(c).
Frequently Asked Questions
What erosion control does Palm Coast require during construction near water?
How long do I have to clean up eroded construction material?
Are there special erosion rules for seawalls and bulkheads?
Sources & Official References
Other rules in Palm Coast
Florida rules heatmap·Compare Palm Coast to another location·View the Florida environmental rules overview