Ventura County, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit required
Coastal Development Permit for grading
Report required
Hydrology and hydraulics report
Storm events analyzed
2-, 10-, 50-, 100-year
Reviewing agencies
Public Works & Resource Management

Summary

Grading in unincorporated Ventura County's coastal zone requires a Coastal Development Permit, and applicants must submit a hydrology and hydraulics report showing storm flow won't increase beyond pre-development rates.

City-specific rules exist: Camarillo, Ventura, Moorpark, Simi Valley, Thousand Oaks, and Oxnard have their own erosion control rules that differ from Ventura County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

Development shall be designed so that any difference (i.e., increase) in storm flow rate or amount must either be percolated into the ground onsite or released at the undeveloped flow rate from the site. ... (a) Grading permit applications must include a hydrology and hydraulics report, prepared by a civil engineer, that includes a map showing the entire drainage area and the estimated runoff of the area.

Source: Ventura County Building & SafetyView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 51).

Full Breakdown

The County's Coastal Zoning Ordinance requires a Coastal Development Permit before grading in the unincorporated coastal zone; the rule doesn't reach the ten incorporated cities or inland areas outside the coastal zone. Development must be designed so any increase in storm flow is either percolated on-site or released at the pre-development rate. Grading permit applications must include a hydrology and hydraulics report from a civil engineer, mapping the drainage area and estimating runoff, examining 2-, 10-, 50-, and 100-year storm events. The Public Works Agency and Resource Management Agency review applications for conformance.

Violations & Fines

Grading or development that increases off-site storm flow beyond the pre-development rate, or that proceeds without an approved hydrology report, violates the permit standards and can block or revoke the Coastal Development Permit.

Frequently Asked Questions

Do I need a permit to grade land in unincorporated Ventura County?
Yes, in the coastal zone a Coastal Development Permit is required, and larger projects need a civil engineer's hydrology and hydraulics report.
Can grading increase runoff onto my neighbor's property?
No, the design must either percolate the increased storm flow on-site or release it at the pre-development rate.

Sources & Official References

Other rules in Ventura County

All Ventura County rules

California rules heatmap·Compare Ventura County to another location·View the California environmental rules overview

Get notified when Erosion Control in Ventura County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Ventura County