Porterville, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
PMC 407.03(J)
Standard applied
California Building Code grading rules
Enforcing official
Engineering and Project Management Director
Alternative allowed
Individual lot grading plans on steep terrain
Related condition
Storm Water Management Plan, Sec. 407.03(L)

Summary

In the City of Porterville, every approved subdivision map must comply with grading and erosion control standards under the California Building Code to prevent sedimentation and off-site property damage. The Engineering and Project Management Director oversees compliance, and steep terrain can shift a subdivider from a mass grading plan to lot-by-lot grading.

J. Grading and Erosion Control. Every map approved pursuant to this Series shall be conditioned on compliance with the requirements for grading and erosion control, including the prevention of sedimentation or damage to off-site property, set forth in of the California Building Code of the most recently adopted edition. Steep terrain and other topographical features may limit the abilities of a subdivider to perform mass grading operations. At the discretion of the Engineering and Project Management Director, individual grading plans for each individual lot may be submitted with the building permit in lieu of a mass grading plan normally submitted with the improvement plans.

Full Breakdown

Porterville Municipal Code Section 407.03(J) conditions every approved tentative, final, or parcel map on compliance with grading and erosion control requirements set out in the most recently adopted edition of the California Building Code, specifically targeting the prevention of sedimentation or damage to off-site property during and after construction. This sits within the Design and Construction Standards article of the city's Subdivision Series, alongside street, drainage, and utility standards that apply to the same map approvals. Because Porterville sits at the foot of the Sierra Nevada with steep terrain on the city's east side, the code recognizes that a single mass grading plan for an entire subdivision is not always workable.

The Engineering and Project Management Director has discretion to allow individual lot grading plans, submitted with each building permit, in lieu of the mass grading plan that would normally accompany the subdivision's improvement plans. Separately, Section 407.03(L) requires every approved map to comply with the city's Storm Water Management Plan, covering measures that control both construction-site runoff and post-construction runoff, so a builder working through plan check will typically face both the grading/erosion condition and the stormwater condition on the same project. Compliance is verified by Community Development and Engineering staff before improvement plans and building permits are released, and failure to grade or control erosion as conditioned can hold up final map recordation or permit issuance.

Violations & Fines

Grading or erosion control work that does not conform to the conditions imposed under Section 407.03(J) can result in the City withholding approval of improvement plans, building permits, or final map recordation until the subdivider corrects the grading or erosion control measures. Because the condition attaches directly to map approval, noncompliance is enforced through the permitting and inspection process administered by the Engineering and Project Management Director rather than through a standalone citation.

Frequently Asked Questions

Does Porterville require an erosion control plan for new subdivisions?
Yes. Porterville Municipal Code Section 407.03(J) conditions every approved subdivision map on compliance with grading and erosion control requirements in the California Building Code, aimed at preventing sedimentation or damage to neighboring property during construction.
Can a subdivider grade lots individually instead of the whole site at once?
The Engineering and Project Management Director can allow individual lot grading plans submitted with each building permit instead of one mass grading plan, when steep terrain or other topography makes mass grading impractical for the subdivision.
Is stormwater runoff control separate from the erosion control condition?
Yes. Section 407.03(L) separately requires every approved map to comply with the City's Storm Water Management Plan, which addresses construction-site and post-construction runoff in addition to the grading and erosion control condition in Section 407.03(J).

Sources & Official References

Other rules in Porterville

All Porterville rules

California rules heatmap·Compare Porterville to another location·View the California environmental rules overview

Get notified when Erosion Control in Porterville, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.