Porterville, CA Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- PMC 407.03(J)
- Standard applied
- California Building Code grading rules
- Enforcing official
- Engineering and Project Management Director
- Alternative allowed
- Individual lot grading plans on steep terrain
- Related condition
- Storm Water Management Plan, Sec. 407.03(L)
Summary
In the City of Porterville, every approved subdivision map must comply with grading and erosion control standards under the California Building Code to prevent sedimentation and off-site property damage. The Engineering and Project Management Director oversees compliance, and steep terrain can shift a subdivider from a mass grading plan to lot-by-lot grading.
J. Grading and Erosion Control. Every map approved pursuant to this Series shall be conditioned on compliance with the requirements for grading and erosion control, including the prevention of sedimentation or damage to off-site property, set forth in of the California Building Code of the most recently adopted edition. Steep terrain and other topographical features may limit the abilities of a subdivider to perform mass grading operations. At the discretion of the Engineering and Project Management Director, individual grading plans for each individual lot may be submitted with the building permit in lieu of a mass grading plan normally submitted with the improvement plans.
Full Breakdown
Porterville Municipal Code Section 407.03(J) conditions every approved tentative, final, or parcel map on compliance with grading and erosion control requirements set out in the most recently adopted edition of the California Building Code, specifically targeting the prevention of sedimentation or damage to off-site property during and after construction. This sits within the Design and Construction Standards article of the city's Subdivision Series, alongside street, drainage, and utility standards that apply to the same map approvals. Because Porterville sits at the foot of the Sierra Nevada with steep terrain on the city's east side, the code recognizes that a single mass grading plan for an entire subdivision is not always workable.
The Engineering and Project Management Director has discretion to allow individual lot grading plans, submitted with each building permit, in lieu of the mass grading plan that would normally accompany the subdivision's improvement plans. Separately, Section 407.03(L) requires every approved map to comply with the city's Storm Water Management Plan, covering measures that control both construction-site runoff and post-construction runoff, so a builder working through plan check will typically face both the grading/erosion condition and the stormwater condition on the same project. Compliance is verified by Community Development and Engineering staff before improvement plans and building permits are released, and failure to grade or control erosion as conditioned can hold up final map recordation or permit issuance.
Violations & Fines
Grading or erosion control work that does not conform to the conditions imposed under Section 407.03(J) can result in the City withholding approval of improvement plans, building permits, or final map recordation until the subdivider corrects the grading or erosion control measures. Because the condition attaches directly to map approval, noncompliance is enforced through the permitting and inspection process administered by the Engineering and Project Management Director rather than through a standalone citation.
Frequently Asked Questions
Does Porterville require an erosion control plan for new subdivisions?
Can a subdivider grade lots individually instead of the whole site at once?
Is stormwater runoff control separate from the erosion control condition?
Sources & Official References
Other rules in Porterville
California rules heatmap·Compare Porterville to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.