Putnam County, FL Environmental Rules: Erosion Control (2026)
Key Facts
- Trigger grade
- 2% or steeper ditch grade
- Trigger slope
- Sidewall slope steeper than 3:1
- Sod strip at headwalls
- Two feet wide
- Enforcing office
- Putnam County Public Works Director
- Exception available
- If soil stability shown without it
Summary
In unincorporated Putnam County, any drainage ditch graded two percent or steeper, with sidewall slopes steeper than 3:1, or where it meets a deeper ditch, must get erosion control such as paving, rip-rap, ditch checks or sodding right after final grading, and mitered headwall installations need a two-foot sod strip, under Putnam County Code section 14-34.
Sec. 14-34. - Erosion control. (a)In ditches with a grade greater than or equal to a two percent and/or sidewall slopes greater than 3:1, and where ditches intersect deeper drainage ditches, erosion control shall be provided immediately after final grade is completed such that the soils in the ditch will remain substantially in place during design frequency storm events. Erosion control shall consist of concrete or asphalt paving, sandbag rip-rap, ditch checks, grade stabilization structures, sodding, or a combination of these. Unless otherwise specified by the public works director, a two-foot-wide strip of sod around mitered headwall installations shall be added immediately upon completion of headwall installations.(b)The public works director may grant an exception to the provisions of this article provided the applicant can show that the soils in the ditch will remain substantially in place during design frequency storm events.
Full Breakdown
Section 14-34 of the Putnam County Code, part of Chapter 14's drainage standards enforced by the county Public Works Director, requires erosion control wherever a ditch's grade reaches two percent or its sidewalls slope steeper than 3:1, and wherever a ditch intersects a deeper drainage ditch. The erosion control must go in immediately after final grading is finished, and it must keep the ditch's soils substantially in place through a design-frequency storm event. The section lists acceptable methods: concrete or asphalt paving, sandbag rip-rap, ditch checks, grade stabilization structures, sodding, or a combination of these.
Unless the Public Works Director specifies otherwise, every mitered headwall installation also needs a two-foot-wide strip of sod placed around it as soon as the headwall is finished, tying this rule to the culvert and headwall standards in Section 14-33. The Public Works Director may grant an exception if the applicant demonstrates the ditch's soils will stay substantially in place during a design storm without the specified erosion control, giving builders a documented path around the default methods when site conditions do not require them.
Erosion control plans are reviewed alongside the drainage permit application required under Section 14-24, so a project cannot get its construction permits until both the drainage permit and its erosion control measures are approved by the Public Works Director's office.
Violations & Fines
Failing to install the required erosion control, or interfering with the Public Works Director's inspection of a ditch under Section 14-22, leaves a site out of compliance with Chapter 14 and can block other county construction permits for the property until the erosion control work is completed and accepted by the Public Works Director's office.
Frequently Asked Questions
When does Putnam County require erosion control in a drainage ditch?
What erosion control methods satisfy Putnam County's ditch rule?
Can a builder skip the standard erosion control methods?
Sources & Official References
Other rules in Putnam County
Florida rules heatmap·Compare Putnam County to another location·View the Florida environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.