Skip to main content
CityRuleLookup

Quincy, MA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit threshold
1 acre or more land disturbance
Issuing authority
City Engineer
Application
10 copies of stormwater plan + fee
Fine
$300 per violation per day

Summary

Quincy requires a stormwater management and land disturbance permit before any project disturbs one acre or more of land, administered by the City Engineer under Chapter 300 of the Municipal Code.

Any activities that result in a land disturbance of one acre or greater within the City of Quincy. "Land disturbance" shall mean any action that causes vegetation clearing (including tree cutting) or a change in the position, location, or arrangement of soil, sand, rock, gravel or similar earth material; and

(3) Any activities that result in a land disturbance less than one acre if the project is part of a larger common plan of development which will disturb one acre or more within the City of Quincy. Plans that do not require approval under the Subdivision Control Law, hereafter referred to as "approval not required or ANR lots," and meet one or more of the applicability criteria described herein are subject to the provisions of this article and shall obtain a stormwater management and land disturbance permit.

B. No person who meets the applicability of this article shall alter land within the City of Quincy without having obtained a stormwater management and land disturbance permit, with the following exemptions:

(1) Normal maintenance and improvement of land in agricultural or aquacultural use, as defined by the Wetlands Protection Act Regulations, 310 CMR 10.04, and MGL c. 40A, § 3.

(2) Ground disturbances in the course of customary cemetery use and regular maintenance.

(3) Maintenance of existing landscaping, gardens, or lawn areas associated with a single-family dwelling.

(4)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4608810; v7 updated 2025-10-06; through 10-06-2025).

Full Breakdown

The permit covers subdivisions, one-acre-plus land disturbances, and smaller projects within a larger common plan exceeding an acre. Applicants file with the City Engineer, submit ten copies of stormwater, erosion-control and operation-and-maintenance plans, pay review fees, and publish public notice. Routine landscaping, cemetery upkeep, fencing and utility work that doesn't alter drainage are exempt, as is work already permitted by the Planning Board, Zoning Board or Conservation Commission before the article took effect.

Violations & Fines

Noncriminal disposition under § 300-24 sets a $300 fine per violation; each day the violation continues counts as a separate offense, plus City abatement costs billed to the violator.

Frequently Asked Questions

Does regrading a Quincy backyard need a permit?
Only if it disturbs an acre or more, or is part of a larger project that does; ordinary lawn and garden maintenance on a single-family lot is exempt under § 300-18B(3).
Who reviews Quincy grading and stormwater permits?
The City Engineer administers and enforces the permit under § 300-19, with fees and procedures set by Public Works rules.

Sources & Official References

Other rules in Quincy

All Quincy rules

Compare Quincy to another location·View the Massachusetts environmental rules overview

Get notified when Erosion Control in Quincy, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.