Salem, OR Environmental Rules: Erosion Control (2026)
Key Facts
- Permit trigger
- 1,000 sq ft or more of ground disturbance
- Governing chapter
- SRC Chapter 75, Erosion Prevention
- Civil penalty ceiling
- $2,000 per violation, per day
- Certified plan threshold
- 10,000 sq ft requires certified professional
- Enforcing official
- City Director (Public Works)
Summary
Salem bans visible, measurable erosion or sediment reaching its storm system and requires an erosion control permit for ground disturbance of 1,000 square feet or more, with civil penalties up to $2,000 per day for violations.
Sec. 75.030. - Erosion prohibited. No person shall cause or suffer visible and measurable erosion or sediment which enters or is likely to enter the public storm drainage system, drainage courses, or wetlands. ... Sec. 75.050. - Erosion control permits. (a)Except as provided in subsection (b) of this section, no person shall conduct ground disturbing activities equal to or greater than 1,000 square feet of land surface at one time that cause or is likely to cause a temporary or permanent increase in the rate of soil erosion from a site without first obtaining an erosion control permit from the Director.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 26 Update 1).
Full Breakdown
Chapter 75 of the Salem Revised Code applies to all parcels and land in the city, regardless of whether construction is underway. 030 flatly prohibits any person from causing or suffering visible and measurable erosion or sediment that enters or is likely to enter the public storm drainage system, drainage courses, or wetlands. 050 requires an erosion control permit from the Director before conducting ground disturbing activities equal to or greater than 1,000 square feet of land surface at one time that cause or are likely to cause a temporary or permanent increase in soil erosion.
140. 060. 090 separately bars tracking or depositing construction debris onto streets or into the storm drainage system, though temporary stockpiling of clean construction materials in the right-of-way is allowed for up to five working days with protective measures. 175: the Director may issue stop-work orders or revoke a permit, and any person who fails to comply with the chapter, works without a required permit, or violates a stop-work order is subject to a civil penalty of up to $2,000 per violation, with each day of a continuing violation counted as a separate violation. The City will not issue a Notice of Final Completion until a violation is cured and any penalty is paid.
Violations & Fines
Failing to obtain a required erosion control permit, violating the no-erosion standard in SRC 75.030, or disobeying a stop-work order draws a civil penalty of up to $2,000 per violation under SRC 75.175(b), with each day of continued violation a separate offense. Violations of SRC 75.170 (contaminated soils), 75.175(a), and 75.200 (falsifying information) are misdemeanors; other violations of the chapter are infractions under SRC 75.210.
Frequently Asked Questions
Do I need a permit to landscape my Salem backyard?
What is the fine for erosion control violations in Salem?
Can I store construction materials in the street during a Salem project?
Sources & Official References
Other rules in Salem
Compare Salem to another location·View the Oregon environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.