Sherman, TX Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Design standard
North Central Texas Stormwater Quality Construction Site BMP Manual
Soil stabilization
Within five days of clearing or inactivity
Stockpiles
Stabilized or covered at end of each workday
Phasing
Required on sites disturbing greater than thirty acres
Permit fee
$25.00 under one acre; $45.00 at one acre or more
Cure period
Twenty-four hours before stop-work order or citation
Code section
Sherman Code of Ordinances § 3.13.005

Summary

In the City of Sherman, Texas, construction sites must meet the North Central Texas BMP Manual design criteria, stabilize soil within five days of clearing or inactivity, and install sediment controls before clearing begins. Sites disturbing greater than thirty acres must be phased. The design rules are in Sherman Code of Ordinances § 3.13.005.

Grading, erosion control practices, sediment control practices, and waterway crossings shall meet the design criteria set forth in the most recent version of the North Central Texas Stormwater Quality Construction Site BMP Manual, and shall be adequate to prevent transportation of sediment from the site to the satisfaction of the city. ... Phasing shall be required on all sites disturbing greater than thirty acres, with the size of each phase to be established at plan review and as approved by the city. ... Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and have been stabilized. ... Soil must be stabilized within five days of clearing or inactivity in construction, using recommended methods described in the construction site BMP manual. ... Soil stockpiles must be stabilized or covered at the end of each workday. ... Sediment controls shall be provided in the form of settling basins or sediment traps or tanks, and perimeter controls.

Full Breakdown

Article 3.13 of the Sherman Code regulates stormwater discharges from construction activities in the City of Sherman, Texas, and section 3.13.005 holds the design requirements. Grading, erosion control practices, sediment control practices and waterway crossings must meet the design criteria in the most recent North Central Texas Stormwater Quality Construction Site BMP Manual and be adequate to prevent sediment leaving the site to the city's satisfaction. Clearing of natural resources such as forests and wetlands is not permitted except in compliance with all other chapters of the code, and clearing techniques must retain natural vegetation and drainage patterns. Phasing is required on every site disturbing greater than thirty acres, with each phase sized at plan review.

Sequencing is fixed: clearing, other than what is necessary to establish sediment control devices, cannot begin until all sediment control devices are installed and stabilized. Soil must be stabilized within five days of clearing or inactivity in construction, stockpiles must be stabilized or covered at the end of each workday, dust and sediment blowing must be prevented, and upland runoff must be diverted past disturbed slopes. Sediment controls take the form of settling basins, sediment traps or tanks, and perimeter controls, with adjacent properties protected by a vegetated buffer strip. Every site needs a temporary access entrance, and all temporary devices come out upon final occupancy or once permanent ground cover is established.

Paperwork depends on site size. Under section 3.13.003, land disturbance or construction of one acre or greater requires a notice of intent and an erosion control plan under TPDES construction general permit TXR 150000, with a copy of the notice filed with the city as operator of the MS4. Smaller sites file a limited pollution prevention plan with the building permit application, and a construction site pollution prevention inspection fee of $25.00 for less than one acre or $45.00 for one acre or greater is paid at that time. Section 3.13.007 adds waste rules, including a designated concrete washout pit.

Violations & Fines

Section 3.13.009 gives a responsible party a written notice and a twenty-four hour cure period. If the site is still out of compliance at reinspection, the city can issue a stop-work order and cite each violation. Violations are a class C misdemeanor with a fine under section 1.01.009, up to $500, with each day a separate offense. Sediment washed onto streets, storm drains or rights-of-way is also a nuisance under section 3.13.003.

Frequently Asked Questions

What erosion control standard applies to Sherman construction sites?
Section 3.13.005 requires grading, erosion control, sediment control and waterway crossings to meet the most recent North Central Texas Stormwater Quality Construction Site BMP Manual criteria, and to be adequate to prevent sediment leaving the site to the satisfaction of the City of Sherman, Texas.
How fast must bare soil be stabilized?
Soil must be stabilized within five days of clearing or inactivity in construction, using methods described in the construction site BMP manual. Soil stockpiles must be stabilized or covered at the end of each workday, and techniques must prevent blowing of dust or sediment from the site.
What does a small site under one acre have to file?
Under section 3.13.003(c), operators of sites under one acre not covered by TPDES permit TXR 150000 prepare a limited pollution prevention plan submitted with the building permit application. It states the erosion and sediment controls and pollution prevention practices. The inspection fee for under one acre is $25.00.
What happens if a site leaks sediment into the street?
The responsible party gets written notice and twenty-four hours to correct, including sediment cleanup and device repair. If the reinspection still fails, the city can issue a stop-work order, which suspends all city permits and inspections for the site, and issue a citation for each violation.

Sources & Official References

Other rules in Sherman

All Sherman rules

Texas rules heatmap·Compare Sherman to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Sherman, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.