St. Joseph County, IN Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

State standard
SWPPP must comply with Indiana Rule 5, 327 IAC 15-5
Technical spec
County Design Guide and Standards Manual governs practices
First offense
Written notice, minimum 10 working days to correct
Second offense
Civil penalty plus 5 more working days
Third offense
Civil penalty plus stop-work order
Sediment liability
Removal costs recoverable as a property lien

Summary

St. Joseph County's sediment and erosion control chapter ties every construction site's erosion plan to Indiana's Rule 5 storm water program and the county's own Design Guide and Standards Manual. A violation does not draw an instant fine: the county first issues a written notice and correction deadline, and only escalates to civil penalties and a stop-work order if the site stays out of compliance.

These county ordinances apply to unincorporated areas of St. Joseph County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Rule 5 refers to 327 I.A.C. 15-5-1 through 15-5-12, "Rule 5. Storm Water Run-Off Associated with Construction Activity". The rule establishes specific minimum requirements for control of storm water runoff associated with construction activity...Storm water pollution prevention plan (SWPPP) means a sediment and erosion control plan in compliance with Rule 5 and this chapter...(2)First offense means the initial determination of a violation or group of violations at a project site. Upon determining and documenting the first violation, the county shall notify the permittee in writing and make a recommendation of the necessary correction...A minimum ten working days shall be granted to make necessary corrections, after the issuance of the notice to prevent the citation of a second violation regarding the same condition.(3)Second offense means the deadline established in the first violation is past and the condition constituting the first violation remains uncorrected...the county shall again notify the permittee in writing, shall enforce a civil penalty as set out in the appendix: schedule of fines and fees.

Source: Indiana CodeView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 3).

Full Breakdown

C. 15-5-1 through 15-5-12, sets the state's minimum erosion-control standards for construction activity, and a footnote to the whole chapter directs enforcement staff to the county's own Design Guide and Standards Manual for the technical specifications behind those standards. 02 requires anyone conducting land-disturbing activity of an acre or more, or part of a larger common development that reaches an acre, to comply with the chapter's erosion and sediment controls unless they already hold an individual NPDES permit. 03 must specify to meet Rule 5's project-site requirements.

99 requires the county to document a first violation in writing with a correction recommendation, and to give the responsible party a minimum of ten working days to fix the erosion or sediment problem before a second violation can be cited on the same condition.

Violations & Fines

A second offense under section 53.99 draws a written notice plus a civil penalty from the appendix fee schedule and five more working days to correct the condition. A third offense adds another civil penalty and an immediate stop-work order through the building commissioner, staying in effect until corrective measures are finished and the county is paid in full. A site that sheds sediment into a right-of-way, drain or storm sewer is separately liable for removal costs under section 53.05, collectible as a lien under IC 36-1-6-2.

Frequently Asked Questions

What erosion control standard does St. Joseph County actually require on a construction site?
Chapter 53 requires a SWPPP that meets Indiana's Rule 5, 327 I.A.C. 15-5-1 through 15-5-12, and conforms to the county's Design Guide and Standards Manual for the specific measures. Section 53.01 defines the SWPPP as "a sediment and erosion control plan in compliance with Rule 5 and this chapter."
Does St. Joseph County fine me the first time an erosion control measure fails?
No. Section 53.99 requires a written notice and a correction recommendation on a documented first offense, with a minimum ten working days to fix it. Civil penalties from the fee schedule only start on a second documented violation of the same condition.
Who enforces sediment and erosion control in unincorporated St. Joseph County?
The county engineering department and its MS4 Operator administer chapter 53 and can inspect sites, while the building commissioner issues the stop-work order that follows a third documented offense under section 53.99, staying in force until corrections and payment are complete.

Sources & Official References

Other rules in St. Joseph County

All St. Joseph County rules

Compare St. Joseph County to another location·View the Indiana environmental rules overview

Get notified when Erosion Control in St. Joseph County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.