Texas City, TX Environmental Rules: Erosion Control (2026)
Key Facts
- Inspections
- Every 14 calendar days and within 24 hours of half-inch storm
- Notice of intent
- Seven days before starting one-acre disturbances
- Concrete washout
- Single on-site location designed for 0% leaching
- SWPPP fixes
- Seven days after city notification
- Enforcer
- City Engineer or Storm Water Manager
- Criminal fine
- $250 to $2,000 per violation
Summary
In Texas City, Texas, every construction site operator must use best management practices to keep sediment out of the MS4, inspect disturbed areas at least once every 14 calendar days and within 24 hours after a storm of one-half inch or more, and file a notice of intent seven days before starting one-acre disturbances.
(A) General requirements. (1) All operators of construction sites shall use best management practices to control and reduce the discharge, to the MS4 and to waters of the United States, of sediment, silt, earth, soil and other material associated with the clearing, grading, excavation and other construction activities to the maximum extent practicable. ... (2) Qualified personnel (provided by the operator of the construction site) shall inspect disturbed areas of any construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least once every 14 calendar days and within 24 hours of the end of a storm that is one-half inch or greater.
Full Breakdown
Section 158.23 of the Texas City Code puts erosion and sediment control on the operator of every construction site, whatever its size. Best management practices must control and reduce discharge of sediment, silt, earth and soil to the MS4 and waters of the United States to the maximum extent practicable. The listed measures include preserving existing vegetation, stabilizing disturbed areas with seeding, mulching, geotextiles or sod as soon as practicable, diverting flows from exposed soils, minimizing off-site tracking by vehicles, and keeping cement, lime, concrete and mortar out of the MS4.
Each site needs a single on-site concrete truck washout with an appropriate BMP to ensure 0% leaching into surrounding soil, and portable fueling tanks need secondary containment.\n\nQualified personnel provided by the operator must inspect disturbed areas not finally stabilized, exposed material storage, structural controls and vehicle entrances and exits, at least once every 14 calendar days and within 24 hours of the end of a storm that is one-half inch or greater. Practices are revised based on the results. The city can deny a building permit, grading permit, certificate of occupancy, subdivision plat or site development plan if the City Engineer or Storm Water Manager finds the practices do not control sediment.
A contractor responsible for a control measure is jointly and severally responsible for willful or negligent failure to implement it.\n\nSites disturbing one or more acres, including parts of a common plan of development, must submit a signed notice of intent to the City Engineer at least seven days before construction begins and prepare a storm water pollution prevention plan under the TPDES construction general permit. Contractors named in the plan sign a certification before work. If the City Engineer or Storm Water Manager notifies the operator that the plan is deficient, the required changes and a written certification are due within seven days. Section 158.21(D) separately bans harmful quantities of sediment from entering the MS4.
Violations & Fines
Violations of Chapter 158 are misdemeanors under § 158.99, punishable by a fine of not less than $250 nor more than $2,000 for each violation, and each day is a separate offense. The City Engineer or Storm Water Manager can also issue a notice of non-compliance, a cease and desist order, or a red tag that stops construction and bars further inspections and approvals at the site.
Frequently Asked Questions
How often must a Texas City construction site be inspected for erosion control?
When is a notice of intent due in Texas City?
Can Texas City stop a project over poor erosion control?
Where does concrete truck washout go on a Texas City site?
Sources & Official References
Other rules in Texas City
Texas rules heatmap·Compare Texas City to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in this county handle erosion control.