Troy, NY Environmental Rules: Erosion Control (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Trigger
Land disturbance of one acre or more, or part of a larger plan
Required approval
Stormwater pollution prevention plan (SWPPP)
Maximum cut and fill slope
2:1 unless retaining walls or stabilization are used
Stabilization deadline
No more than 14 days after work on an area stops
Watercourse buffer
Fifty feet, no clearing or grading
Professional inspections
Every seven calendar days and within 24 hours of a 0.5 inch storm
Fine
Not more than $250 per offense, each day separate

Summary

In the City of Troy, New York, no one can start a land development activity without an approved stormwater pollution prevention plan, and Chapter 159 sets the construction-site rules that plan must meet: slopes no steeper than 2:1, stabilization within 14 days of work stopping, stockpiles covered every workday, and no clearing or grading inside the fifty-foot watercourse buffer.

(2) Cut and fill slopes shall be no greater than 2:1, except where retaining walls, structural stabilization or other methods acceptable to the City-designated licensed/certified professional are used. ... (4) Clearing, except that necessary to establish sediment control devices shall not begin until all sediment control devices have been installed and have been stabilized. ... (6) The permittee shall initiate stabilization measures as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. ... (10) Soil stockpiles must be stabilized or covered at the end of each workday. (11) The entire site must be stabilized, using a heavy mulch layer or another method that does not require germination to control erosion, at the close of the construction season.

Full Breakdown

Chapter 159 of the Troy City Code, adopted by the City Council as Local Law No. 1-2008, applies to any land development activity. Section 159-5 defines that as construction activity disturbing one acre or more, plus smaller disturbances that are part of a larger common plan of development or sale. Under § 159-4, no person can commence or perform that work without an approved stormwater pollution prevention plan (SWPPP). Exempt activities include emergency work, normal lawn and landscaping maintenance, home gardening, and agricultural operations where the land disturbance is under one acre.

The design standards in § 159-11 are the operative construction rules. Cut and fill slopes cannot exceed 2:1 unless retaining walls, structural stabilization or other acceptable methods are used, and disturbed areas must be restored as natural appearing landforms. Sediment controls go in first: clearing cannot begin until all sediment control devices have been installed and stabilized. Stabilization must start within 14 days after work stops on a portion of the site, with exceptions for snow cover or frozen ground and for areas where earth-disturbing work resumes within 21 days. Seeding must become established within 14 days or the applicant can be required to reseed or switch to a nonvegetative option. Phasing is required on sites disturbing greater than 30 acres, and no more than five acres of soil can sit disturbed at one time without prior written approval from the New York State Department of Environmental Conservation. Land-disturbing activity is not permitted on severe slopes, those exceeding 25%, and a twenty-five-foot buffer must be kept between any disturbed area and the top of those slopes.

Inspection is built into the process. Under § 159-14, the applicant notifies the City Zoning Enforcement Officer at least 48 hours before the start of construction, completion of rough grading, completion of final grading and the other listed stages. A qualified professional inspects the site at least every seven calendar days and within 24 hours of a storm event of 0.5 inch or greater, and the operator keeps the results in a site logbook.

Violations & Fines

Under § 159-19 the Zoning Enforcement Officer can issue a written notice of violation, and the violator has 15 days to take remedial measures. The officer can also issue a stop-work order that halts everything except the fixes, and can prevent occupancy. A violation is a misdemeanor with a fine of not more than $250 for each offense, each day counts separately, and the violator bears the cost of restoration. Land not restored becomes a lien on the property.

Frequently Asked Questions

When does the City of Troy require a stormwater pollution prevention plan?
Under § 159-4, no person can commence or perform any land development activity without an approved SWPPP. Section 159-5 defines that as construction activity disturbing one acre or more, including smaller disturbances that belong to a larger common plan of development or sale. Emergency work, routine maintenance of stormwater facilities, normal lawn and landscaping work and home gardening are exempt.
How soon must bare ground be stabilized after work stops in Troy?
Section 159-11 requires stabilization to start as soon as practicable and in no case more than 14 days after construction activity in that portion of the site has temporarily or permanently ceased. Snow cover or frozen ground delays the start, and temporary stabilization is not required where earth-disturbing work resumes within 21 days. Soil stockpiles must be stabilized or covered at the end of each workday.
Who inspects Troy construction sites, and how often?
The City Zoning Enforcement Officer or designated agent can require inspections, and applicants give at least 48 hours notice before listed stages such as rough grading and final grading. Separately, § 159-14 requires a qualified professional to inspect at least every seven calendar days and within 24 hours of a storm event of 0.5 inch or greater, with records kept in a site logbook.
What happens when a site violates Chapter 159 in Troy?
The Zoning Officer can issue a written notice of violation giving the violator 15 days to take remedial measures, and can issue a stop-work order halting all land development activity except the fixes. Section 159-19 makes a violation a misdemeanor with a fine of not more than $250 for each offense, each day separate, plus the expense of restoration.
Is there a buffer near streams and wetlands?
Section 159-11 forbids clearing or grading within the established fifty-foot watercourse buffer, except road crossings where permitted. A vegetative buffer of 25 feet minimum must be kept between disturbed areas and protected federal wetlands, and the one-hundred-foot adjacent area of state-designated wetlands cannot be disturbed without a New York State Department of Environmental Conservation permit.

Sources & Official References

Other rules in Troy

All Troy rules

New York rules heatmap·Compare Troy to another location·View the New York environmental rules overview

Get notified when Erosion Control in Troy, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.