Key Facts

Topsoil removal from site
Not permitted; no use as spoil
Minimum topsoil redistribution
At least six inches over the site
Control standard
Chapter 459 of the Laws of 1979
Plan filed with
Secretary of the Planning Board
Multi-tree removal, one lot, six months
Soil disturbance permit, Construction Department

Summary

In the Town of West New York, NJ, development under the subdivision chapter cannot strip topsoil from the site or use it as spoil, and moved topsoil must be redistributed to at least six inches. Soil erosion and sedimentation control must follow Chapter 459 of the Laws of 1979. Removing multiple trees on one lot needs a soil disturbance permit.

§ 358-46. Removal of topsoil; soil erosion and sedimentation. No topsoil shall be removed from the site or used as spoil. Topsoil moved during the course of construction shall be redistributed to provide at least six inches to all areas of the subdivision or development site. Topsoil protection and removal, and soil erosion and sedimentation control shall be in accordance with the requirements of Chapter 459 of the Laws of 1979.[1]

Full Breakdown

Section 358-46 of Chapter 358, Subdivision of Land, is the Town of West New York's erosion and sedimentation standard for construction. It applies to a subdivision or development site and does three things. First, no topsoil shall be removed from the site or used as spoil. Second, topsoil moved during the course of construction must be redistributed to provide at least six inches to all areas of the subdivision or development site. Third, topsoil protection and removal, and soil erosion and sedimentation control, must be in accordance with the requirements of Chapter 459 of the Laws of 1979. The code's own editor's note identifies that act as the amendment to the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq., so the Town incorporates the state requirements rather than printing its own technical standards.

Chapter 358 backs the standard with paperwork and definitions. Its definitions section defines "EROSION AND SEDIMENT CONTROL PLAN" as a plan which fully indicates necessary land treatment measures, including a schedule of the timing for their installation, which will effectively minimize soil erosion and sedimentation. It also defines "DISTURB" broadly: to dig, dredge, excavate, remove, strip and grub, deposit, grade, clear, level, fill or otherwise alter or change the location or contour of land so as to expose it to the dangers of erosion. A preliminary plat application must include the required soil erosion and sediment control plans, drawn in accordance with the chapter and any other applicable ordinance, filed with the Secretary of the Planning Board together with at least eight black-line-on-white prints and three complete application forms. The standards for new plantings also require street planting strips to be finished, graded and seeded or sodded in conformance with the certified soil erosion and sediment control plan for the project.

Outside subdivision review, § 379-2 of the Tree Removal chapter bars removing multiple trees on a single lot within a six-month period without a soil disturbance permit from the Construction Department, which reviews the environmental impact of the removal and the related soil disturbance.

Violations & Fines

Section 358-46 states the standard without a penalty figure of its own. The enforcement hook the code prints is the approval process: the Planning Board reviews the soil erosion and sediment control plans filed with a preliminary plat, and § 379-2 prohibits multi-tree removal on a lot without the Construction Department's soil disturbance permit, which it issues only if it finds likely no to minimal environmental impact.

Frequently Asked Questions

Can topsoil be taken off a construction site in West New York, NJ?
No. Section 358-46 says no topsoil shall be removed from the site or used as spoil. Topsoil moved during construction must be redistributed to provide at least six inches to all areas of the subdivision or development site in the Town of West New York.
What state law does West New York use for erosion control?
Section 358-46 requires topsoil protection and removal, and soil erosion and sedimentation control, to be in accordance with Chapter 459 of the Laws of 1979. The code's editor's note says that act amended the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq.
Do I need an erosion control plan to apply for subdivision approval?
A preliminary plat application must include the required soil erosion and sediment control plans, drawn in accordance with Chapter 358 and any other applicable ordinance, and filed with the Secretary of the Planning Board along with at least eight black-line-on-white prints and three complete application forms.
Is a permit needed when soil is disturbed by tree removal?
Under § 379-2, removing more than one tree on a single lot within a six-month period requires a soil disturbance permit from the Construction Department. The department reviews the environmental impact of the removal and related soil disturbance and issues the permit if it finds likely no to minimal impact.

Sources & Official References

Other rules in West New York

All West New York rules

Compare West New York to another location·View the New Jersey environmental rules overview

Get notified when Erosion Control in West New York, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in this county handle erosion control.

Jersey City, NJ
Some Restrictions