Bethlehem, PA Environmental Rules: Flood Elevation Requirements (2026)

Heavy Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard requirement
1.5 feet above the 100-year flood elevation
Applies to
Structures storing/handling listed hazardous substances
Watercourse setback
50 feet landward from top of bank
Variance
Only the freeboard figure itself may be modified
Flood basis
FEMA Flood Insurance Study for City of Bethlehem

Summary

Any structure in Bethlehem's Flood Fringe District used to produce, store, or maintain listed hazardous substances must sit at least one and one-half feet above the one-hundred-year flood elevation, under Codified Ordinances § 1327.06(a). That eighteen-inch freeboard margin is locked into the code so tightly that the Zoning Hearing Board can't grant a variance from it, even though it can waive other requirements in the same subsection.

(a) Any structure, or substantial improvement to any structure which is used for the production, storage, or maintenance of a supply of any of the substances listed in Section 1327.05(d)(1) shall: (1) Be elevated or designed and constructed to remain completely dry up to at least one and one-half (1-1/2') feet above the one hundred (100) year flood elevation. (2) Be designed and constructed to prevent pollution from the structure or activity during the course of a one hundred (100) year flood. (3) Be prohibited within the area measured fifty (50) feet landward from the top-of-bank of any watercourse. (b) Except for a possible modification of the one and one-half (1-1/2) foot freeboard requirement, no variance shall be granted for any of the other requirements of this subsection (a).

Full Breakdown

05(d)(1), such as flammable liquids, pesticides, or other substances classified as hazardous waste under 25 Pa. 261. 06(a) requires those structures, and any substantial improvement to them, to meet three conditions: they must be elevated, designed, or constructed to stay completely dry to at least one and one-half feet above the one-hundred-year flood elevation; they must be designed and built to prevent pollution from escaping during a one-hundred-year flood; and they're barred outright within fifty feet, measured landward, of the top of the bank of any watercourse.

Subsection (b) then locks that freeboard number in place: except for a possible modification of the eighteen-inch freeboard figure itself, no variance shall be granted from any of the other (a) requirements, meaning the fifty-foot watercourse setback and the pollution-prevention design standard are effectively non-negotiable. The regulatory flood elevation the code measures against is the FEMA-mapped one-hundred-year flood documented in the Flood Insurance Study for the City of Bethlehem.

Violations & Fines

Building or expanding a regulated structure below the required freeboard, inside the fifty-foot watercourse buffer, or without pollution-prevention design triggers the same Article 1324 penalty track as other zoning violations: a written correction order from the Zoning Officer, a short window to fix it, and a fine up to $500 per offense under Section 1324.06, payable to the City Treasurer, or up to ninety days in jail if unpaid.

Frequently Asked Questions

How high above flood level must a regulated structure sit in Bethlehem?
At least one and one-half feet above the one-hundred-year flood elevation, elevated or built to stay completely dry to that height, under Codified Ordinances § 1327.06(a). The requirement applies to structures used to produce, store, or maintain the hazardous substances listed in Section 1327.05(d)(1).
Can the Zoning Hearing Board waive the freeboard requirement?
Only the freeboard figure itself is open to modification. Section 1327.06(b) blocks any variance from the structure's other requirements, including the fifty-foot watercourse setback and the pollution-prevention design standard.
Is there a setback from streams in addition to the elevation rule?
Yes. The same structures are barred within fifty feet, measured landward, from the top of the bank of any watercourse, on top of meeting the freeboard and pollution-prevention conditions.

Sources & Official References

Other rules in Bethlehem

All Bethlehem rules

Compare Bethlehem to another location·View the Pennsylvania environmental rules overview

Get notified when Flood Elevation Requirements in Bethlehem, PA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.