Greeley, CO Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard standard
1 foot above BFE
Critical facilities
2 feet above BFE
Certification required from
licensed CO engineer/architect/surveyor
Governing section
City Code § 12-1211

Summary

Greeley requires new and substantially improved buildings in mapped flood hazard areas to elevate the lowest floor and all mechanical equipment one foot above the base flood elevation: two feet for critical facilities like schools and fire stations.

New construction and substantial improvement of any residential structure shall have the lowest floor (including basement) electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities (including ductwork) elevated to one foot above the base flood elevation.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 6 Update 1).

Full Breakdown

City Code § 12-1211(a) requires new construction and substantial improvement of any residential structure in a special flood hazard area to have the lowest floor, including basement, plus all electrical, heating, plumbing and HVAC equipment, elevated to one foot above the base flood elevation (BFE). Colorado's freeboard standard, which exceeds FEMA's bare minimum. Nonresidential buildings must either meet that same one-foot freeboard or be engineered watertight to that height. A registered Colorado professional engineer, architect or land surveyor must certify the final elevation to the floodplain administrator. Critical facilities such as hospitals and fire stations face a stricter two-foot freeboard under § 12-1217(b)(2).

Violations & Fines

Building below the required freeboard without an approved variance is a permit violation enforced by the floodplain administrator; occupancy is withheld until the required engineer's or surveyor's elevation certification is submitted.

Frequently Asked Questions

How high above the base flood elevation must I build in Greeley?
At least one foot, per City Code § 12-1211(a): the lowest floor and all mechanical equipment must be elevated to one foot above BFE, certified by a licensed engineer or surveyor.
Does Greeley require extra freeboard for hospitals or fire stations?
Yes, § 12-1217(b)(2) requires critical facilities to be elevated or floodproofed to two feet above the base flood elevation, double the standard freeboard.

Sources & Official References

Other rules in Greeley

All Greeley rules

Compare Greeley to another location·View the Colorado environmental rules overview

Get notified when Flood Elevation Requirements in Greeley, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.