Key Facts

Freeboard required
2 feet above Base Flood Elevation
No BFE established
2 feet above highest adjacent grade
Permit required
zoning or special use permit before construction
Elevation certificate
FEMA Form 086-0-33, filed at three stages
Enforcing official
City of Mebane Zoning Administrator
Variance authority
Board of Adjustment, Section 8-2(B)
Last amended
June 3, 2024; December 8, 2025

Summary

In the City of Mebane, North Carolina, the Unified Development Ordinance requires new construction and substantial improvements in a Special Flood Hazard Area to sit at or above the Regulatory Flood Protection Elevation, defined in UDO Section 5-6.2 as the Base Flood Elevation plus two feet of freeboard, or two feet above the highest adjacent grade where no BFE has been set. The Zoning Administrator enforces the standard through the floodplain permit process.

36. Freeboard. ... The height added to the Base Flood Elevation (BFE) to account for the many unknown factors that could contribute to flood heights greater that the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization on the watershed. The Base Flood Elevation plus the freeboard establishes the `Regulatory Flood Protection Elevation'. ... ... 59. Regulatory Flood Protection Elevation. The `Base Flood Elevation' plus the `Freeboard'. In `Special Flood Hazard Areas' where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two feet of freeboard. In `Special Flood Hazard Areas' where no BFE has been established, this elevation shall be at least two feet above the highest adjacent grade.

Full Breakdown

UDO Section 5-6, the Flood Hazard Overlay District, applies inside the city and its extraterritorial jurisdiction under Section 1-4 and was most recently amended June 3, 2024 and December 8, 2025. Section 5-6.2 defines the Regulatory Flood Protection Elevation (RFPE) as the Base Flood Elevation plus two feet of freeboard, or two feet above the highest adjacent grade where FEMA has not set a BFE. Section 5-6.7(B) turns that number into a construction rule: new construction and substantial improvement of any residential structure, including manufactured homes, must have its reference level, including the basement, elevated no lower than the RFPE.

Commercial, industrial and other non-residential structures face the same elevation floor, though structures in Zones A, AE, AH, AO and A99 may floodproof to the RFPE instead if a registered professional engineer or architect certifies the design as watertight. Manufactured homes must be elevated so the reference level meets the RFPE and anchored per the North Carolina Regulations for Manufactured Homes; a chassis elevated more than 36 inches above grade needs an engineered foundation. No development may begin in a Special Flood Hazard Area without a zoning or special use permit from the Zoning Administrator under Section 5-6.4, who requires an Elevation Certificate, FEMA Form 086-0-33, before construction starts, again within seven calendar days of the reference level being set, and a final as-built certificate before a Certificate of Compliance or Occupancy is issued. Variance requests go to the Board of Adjustment under Section 8-2(B), with judicial review available under Section 11-7.

Violations & Fines

Section 5-6.3(G) routes flood ordinance violations through Article 11's enforcement and judicial review procedures, with penalties and remedies set under Sections 11-4 and 11-5. The Zoning Administrator can issue a stop-work order the moment work proceeds out of compliance, and Section 5-6.5(P) makes violating that stop-work order a misdemeanor. Failing to submit a required elevation or floodproofing certificate is grounds to deny the floodplain development permit outright or withhold the Certificate of Compliance/Occupancy until the deficiency is corrected.

Frequently Asked Questions

How much freeboard does Mebane require above the base flood elevation?
UDO Section 5-6.2 sets the Regulatory Flood Protection Elevation at the Base Flood Elevation plus two feet of freeboard in areas where FEMA has published a BFE. Where no BFE exists, the required elevation is at least two feet above the highest adjacent grade at the site. New construction and substantial improvements must meet that elevation under Section 5-6.7(B).
Do manufactured homes have to meet the same elevation standard in Mebane?
Yes. Section 5-6.7(B)(3) requires new or replacement manufactured homes to have their reference level elevated no lower than the Regulatory Flood Protection Elevation and securely anchored to resist flotation, collapse and lateral movement. If the chassis sits more than 36 inches above grade, the foundation needs an engineer's certification rather than standard piers.
What permit do I need before building in a Mebane flood hazard area?
Section 5-6.4 requires a zoning or special use permit from the Zoning Administrator before any development activity begins in a Special Flood Hazard Area. The application must include a certified plot plan, proposed elevations, and, for floodproofed non-residential buildings, a FEMA Floodproofing Certificate with an operational and maintenance plan.
What happens if I build below the required elevation?
The Zoning Administrator can deny the floodplain development permit, issue a stop-work order, or withhold the Certificate of Compliance/Occupancy until the elevation is corrected. Section 5-6.5(P) makes violating a stop-work order a misdemeanor, and Section 5-6.3(G) sends other violations through Article 11's enforcement and penalty provisions in Sections 11-4 and 11-5.

Sources & Official References

Other rules in Mebane

All Mebane rules

Compare Mebane to another location·View the North Carolina environmental rules overview

Get notified when Flood Elevation Requirements in Mebane, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.