Key Facts
- Governing section
- UDO § 6-5(A)(12), general parking requirements
- Credit ratio
- 1 EV charging space = 2 standard spaces
- Mandatory?
- No, voluntary incentive, not a requirement
- Added
- UDO amendment, June 6, 2022
- Interacts with
- 150% nonresidential parking cap, § 6-5(C)(1)
Summary
In the City of Mebane, North Carolina, installing an electric vehicle charging station earns a developer double credit toward the Unified Development Ordinance's off-street parking minimums. UDO § 6-5(A)(12) counts one EV charging space as the equivalent of two standard parking spaces required for gasoline vehicles.
12. Electric Vehicle Charging Stations Provision of an electric vehicle charging station shall be credited as the equivalent of two parking spaces for vehicles with combustion engines.
Full Breakdown
The credit is part of the UDO's general off-street parking rules in Section 6-5(A), the same subsection that sets the citywide minimum parking counts, the ADA/handicapped-space requirement drawn from the NC Building Code and the Americans with Disabilities Act, and the residential truck-parking ban. Added by the June 6, 2022 UDO amendment, the EV credit does not require any development to install a charging station; it rewards developers who choose to. A site plan that provides a charging station gets to count that single space as if it were two ordinary parking spaces when the Zoning Administrator checks the plan against the minimum spaces required in Table 6-5-1.
Because Section 6-5(C)(1) also caps most nonresidential parking at 150 percent of the Table 6-5-1 minimum unless the developer obtains an approved parking-demand study, the EV credit gives a project extra room to hit its minimum without paving additional spaces, effectively letting each installed charger substitute for a car space that would otherwise need to be built. The rule applies wherever the general parking chapter applies, meaning any development required to provide off-street parking under Section 6-5, and it is administered at site-plan review rather than through a separate permit.
Violations & Fines
This is an incentive, not a mandate, so there is no penalty for skipping it. The exposure runs the other way: a developer who claims the two-space credit on an approved site plan and then removes or never installs the charging station has altered an approved plan without authorization, which the Zoning Administrator can pursue as a standard UDO violation under Article 11, including a civil penalty and a required correction of the parking count.
Frequently Asked Questions
Does Mebane require new developments to install EV chargers?
How much parking can I save by adding an EV charger?
Can I use the EV credit to exceed the parking cap for commercial sites?
Sources & Official References
Other rules in Mebane
Compare Mebane to another location·View the North Carolina parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.