Skip to main content
CityRuleLookup

Melbourne, FL Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard requirement
BFE plus 1.33 feet, lowest floor
Zone AO minimum
Depth number plus 1.33 ft, or 3 ft floor
Coastal V-Zone
1.33 ft above BFE at lowest structural member
Enforcing agency
Building official as floodplain administrator
Wind design speed
140-160 mph Vult by risk category

Summary

Melbourne requires new and substantially improved buildings in flood hazard areas to elevate their lowest floor to the base flood elevation plus 1.33 feet, a local amendment stricter than the unmodified state floor. Coastal high-hazard V-Zone structures must clear that same 1.33-foot margin at their lowest horizontal structural member.

R322.2.1. Elevation requirements. 1.Buildings and structures in flood hazard areas, including flood hazard areas designated as Coastal A Zones, shall have the lowest floors elevated to or above the base flood elevation plus 1.33 feet or the design flood elevation, whichever is higher.2.In areas of shallow flooding (AO Zones), buildings and structures shall have the lowest floor (including basement) elevated to a height above the highest adjacent grade of not less than the depth number specified in feet on the FIRM plus 1.33 feet, or not less than three feet if a depth number is not specified.3.Basement floors that are below grade on all sides shall be elevated to or above the base flood elevation plus 1.33 feet or the design flood elevation, whichever is higher.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 32).

Full Breakdown

Sec. 80(e) of the Melbourne City Code amends the Florida Residential Code's elevation standards. 33 feet or the design flood elevation, whichever is higher. 33-foot standard. 33-foot margin to coastal high-hazard areas and Coastal A Zones, but measures it to the bottom of the lowest horizontal structural member supporting the lowest floor, excludes pilings, pile caps, columns, grade beams and bracing from that measurement, and bans below-grade basements and the use of fill for structural support outright. The same subsection sets the city's wind speed design zones (140 mph Vult for Risk Category I, 150 mph for Risk Category II, and 160 mph for Risk Category III and IV) and places all of Melbourne in the wind-borne debris region.

The building official, acting as floodplain administrator under Sec. 153, reviews permit applications and can require a Florida-licensed surveyor's certification of the lowest floor's elevation at placement and again at final inspection under Sec. 175 and Sec. 176. Variance requests go to the planning and zoning board under Sec. 178 through Sec. 185, which cannot grant relief that would raise flood heights and must warn applicants in writing that federal flood insurance costs run as high as $25 per $100 of coverage when a structure sits below base flood elevation.

Violations & Fines

A building lacking the documentation proving it meets the 1.33-foot freeboard standard is presumed to be in violation until that proof is supplied, under Sec. 13.186. The floodplain administrator can serve a notice of violation or a stop-work order on the owner, agent, or contractor under Sec. 13.187, and anyone who keeps working after being served is subject to penalties under Sec. 1-14 of the City Code per Sec. 13.188.

Frequently Asked Questions

How far above base flood elevation must a Melbourne home be built?
City amendments to the Florida Residential Code require the lowest floor of buildings in flood hazard areas, including Coastal A Zones, to sit at or above the base flood elevation plus 1.33 feet, or the design flood elevation if higher, under Sec. 13.80(e)(1) of the Melbourne City Code.
What elevation applies in Zone AO shallow-flooding areas?
Buildings must have their lowest floor, including any basement, elevated above the highest adjacent grade by the FIRM's depth number plus 1.33 feet, or at least three feet if the map lists no depth number, under the same amended R322.2.1 standard.
Who enforces Melbourne's freeboard rule?
The city's building official, acting as floodplain administrator under Sec. 13.153, reviews permit applications and construction documents and can require a Florida-licensed surveyor's certification of the lowest floor's elevation before and after construction is complete.
What happens if a building is constructed too low?
A structure lacking documentation proving the required elevation is presumed to be in violation under Sec. 13.186, and the floodplain administrator can serve a notice of violation or stop-work order; continuing work afterward is punishable under Sec. 1-14 of the City Code.

Sources & Official References

Other rules in Melbourne

All Melbourne rules

Florida rules heatmap·Compare Melbourne to another location·View the Florida environmental rules overview

Get notified when Flood Elevation Requirements in Melbourne, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Brevard County handle flood elevation requirements.

Palm Bay, FL
Some Restrictions
Titusville, FL
Some Restrictions
Cocoa, FL
Some Restrictions