Key Facts
- Governing law
- Roadway and Drainage Standards Ordinance § 10.8
- SFHA minimum
- 1 foot above the 100-year flood level
- No-plan default
- 18 inches above adjacent road centerline
- Maximum floor elevation
- 6 inches above approved drainage plan
- Inspection required
- Before certificate of occupancy is issued
- Large-lot exception
- Lots over 1 acre may vary with approval
Summary
Every structure built within a Special Flood Hazard Area in unincorporated Nassau County must set its finished floor at least one foot above the current 100-year flood level, the controlling minimum under Section 10.8.1 of the Roadway and Drainage Standards Ordinance. Outside flood zones, the floor follows the engineer of record's county-approved drainage plan, or sits at least 18 inches above the adjacent road's centerline if no plan exists.
10.8.1. Finished floor elevations shall be constructed at a level one (1) foot or greater than the current 100-year flood level for all structures built within the Special Flood Hazard Areas. In all cases, this shall be the controlling minimum elevation. 10.8.2. In all other areas, the finished floor elevation shall be constructed to the elevations specified in the engineer of record's County approved drainage plan. 10.8.3. If no drainage plan exists, or if the plan predates this chapter, the floor level shall be at least eighteen (18) inches above the centerline elevation of adjacent roadways. Lots greater than one (1) acre may be less if approved by the Engineering Services.
Full Breakdown
8 of Article 10 sets Nassau County's freeboard and grading standards. 1 requires the finished floor of any structure built in a Special Flood Hazard Area to sit at least one foot above the current 100-year flood level, and that elevation controls no matter what else the drainage plan shows. 2 covers everything outside a flood hazard area: the floor must match the elevation in the engineer of record's county-approved drainage plan. 3 sets a floor of at least 18 inches above the centerline elevation of the adjacent roadway, though lots larger than one acre can go lower with Engineering Services' approval.
4 caps the maximum finished floor elevation at six inches above what the approved drainage plan specifies, again with a break for lots over an acre. 6 requires Engineering Services to inspect the completed site grading and confirm in writing that the work matches the permit, and the Board of County Commissioners sets the inspection fee by resolution. 7 requires a separate lot grading plan, showing existing and proposed conditions, whenever fill will be placed more than five feet outside the building foundation or within ten feet of a property line, including fill under a raised septic system.
9 lets Engineering Services require retaining walls, roof gutters, underdrains or swales on top of these elevation rules whenever they are needed for adequate drainage.
Violations & Fines
Engineering Services confirms compliance with Section 10.8 during the site-grading inspection required before a certificate of occupancy is issued: if the finished floor sits below the required elevation, the county will not sign off and can require regrading or additional fill at the owner's expense. Persistent grading violations are referred to the county's special magistrate code enforcement process, which can impose administrative fines and place a lien on the property until the elevation is corrected.
Frequently Asked Questions
How high above flood level must my house be in unincorporated Nassau County?
What if I am not in a flood zone, does Nassau County still set a minimum floor height?
Is there a maximum floor elevation in Nassau County?
When do I need a separate lot grading plan for fill?
Sources & Official References
Other rules in Nassau County
Florida rules heatmap·Compare Nassau County to another location·View the Florida environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.