Pawtucket, RI Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- AO zone elevation without depth number
- 2 feet above highest adjacent grade
- Freeboard height excludable from limit
- Up to 5 feet above BFE
- BFE data trigger for subdivisions
- Over 50 lots or 5 acres
- CRMC map review cycle
- Every 10 years
- Governing sections
- § 410-19 and § 410-132
Summary
Pawtucket ties construction height in flood-prone AO zones to the flood depth number on FEMA's map, or two feet above the highest adjacent ground if no depth number is shown. Citywide, the Zoning Ordinance also lets a property owner exclude the base flood elevation plus up to five feet of extra freeboard from the zone's maximum building-height calculation.
Within Zones AO on the FIRM, new and substantially improved residential structures shall have the top of the lowest floor at least as high as the FIRM's depth number above the highest adjacent grade and nonresidential structures shall be elevated or floodproofed above the highest adjacent grade to at least as high as the depth number on the FIRM. On FIRMs without a depth number for the AO Zone, structures shall be elevated or floodproofed to at least two feet above the highest adjacent grade. ... The base flood elevation on the FEMA FIRM plus up to five feet of any utilized or proposed freeboard, less the average existing grade elevation...
Full Breakdown
Section 410-19B(2) sets Pawtucket's baseline elevation standard for Zone AO on the FIRM: new and substantially improved residential structures must have the top of the lowest floor at least as high as the depth number shown on the map, measured above the highest adjacent grade, and nonresidential structures must be elevated or floodproofed to that same height. Where the FIRM does not print a depth number for an AO zone, § 410-19B(2) falls back to a flat two-foot minimum above the highest adjacent grade. Section 410-19C requires base flood elevation data for any subdivision or other development of more than 50 lots or five acres, whichever is smaller, within an unnumbered A Zone, and where FEMA has not published BFE or floodway data, the best available federal, state, or local data must be used to set the elevation instead.
Separately, the Zoning Ordinance's building-height definition at § 410-132 gives owners in mapped special flood hazard areas, or areas the Coastal Resources Management Council's three-foot sea-level-rise map shows as inundated in a 100-year storm, an incentive to add freeboard: the base flood elevation shown on the FIRM plus up to five feet of any proposed freeboard, minus the average existing grade, can be excluded entirely from the structure's height calculation, so raising a foundation above BFE does not consume the zone's height allowance. CRMC is directed to reevaluate its suggested design elevation map for this purpose every 10 years.
Violations & Fines
Violations of the flood-elevation standards are penalized the same way as other Article IV violations: the Building Official enforces compliance under R.I.G.L. § 23-27.3-108.1, and § 410-17B(6) applies the penalty schedule in R.I.G.L. § 23-27.3-122.3. A structure built below the required elevation can also lose eligibility for National Flood Insurance Program coverage, an outcome that runs with the property regardless of city fines.
Frequently Asked Questions
How high above grade must a house be built in Pawtucket's AO flood zone?
Does adding freeboard cost me buildable height under the zoning code?
When does Pawtucket require base flood elevation data for a subdivision?
Sources & Official References
Other rules in Pawtucket
Compare Pawtucket to another location·View the Rhode Island environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in this county handle flood elevation requirements.