Skip to main content
CityRuleLookup

Redding, CA Environmental Rules: Flood Elevation Requirements (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Residential floor elevation
1 foot above base flood elevation
Levee freeboard
3 feet above base flood surface
Near structures/bridges
Extra 1 foot of levee freeboard
Elevation certificate
FEMA Form FF-206-FY-22-152
Flood vent sizing
1 sq in per sq ft of enclosed area

Summary

New residential construction in Redding's mapped flood zones must have its lowest floor at least one foot above the base flood elevation under Municipal Code Section 18.51.080(D)(1), and any levee built for flood protection needs a minimum of three feet of freeboard above the base flood water surface under Section 18.51.080(G)(1)(a).

Residential construction, and accessory structures thereto, including new or substantial improvement in flood zones A, AE, AO, or A1-30, shall have the lowest floor, including basement and machinery and equipment servicing the building, elevated a minimum of one foot above the base flood elevation, as determined by the FIRM maps, by the method in Section 18.51.100, or by the Citywide Master Storm Drain Study by Montgomery-Watson Engineers, whichever is more restrictive...Freeboard. Riverine levees must provide a minimum freeboard of three feet above the water-surface level of the base flood. An additional one foot above the minimum is required within one-hundred feet of either side of structures (such as bridges) riverward of the levee or wherever the flow is constricted.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 48).

Full Breakdown

080 sets the construction standards that apply throughout the floodway and flood fringe. Residential structures and their accessories in zones A, AE, AO, or A1-30 must have their lowest floor, including the basement and any utility equipment servicing the building, elevated at least one foot above the base flood elevation as shown on the FIRM maps or the city's Master Storm Drain Study, whichever number is higher. Nonresidential buildings can meet the same elevation or instead be floodproofed watertight below that height, with structural components certified to resist hydrostatic and hydrodynamic forces.

Any new construction with an enclosed area below the lowest floor used only for parking, access, or storage needs at least two flood-vent openings on different walls, sized to at least one square inch of net opening per square foot of enclosed area, with the bottom of each opening no higher than one foot above grade. An elevation certificate on FEMA Form FF-206-FY-22-152 is required before a building permit is issued, again after the foundation is poured, and a final certificate before occupancy; skipping that paperwork is grounds for a stop-work order.

Levees get their own freeboard standard: three feet above the base flood water surface, with an extra foot required within a hundred feet of any bridge or other flow-constricting structure, tapering to no less than the three-foot minimum by the downstream end. Manufactured homes placed in the mapped floodplain must sit on a permanent foundation with the lowest floor at least one foot above the base floodplain elevation and be anchored against flotation and lateral movement.

Violations & Fines

Building without the required elevation certificate is grounds for the city to issue a stop-work order on the project. The Floodplain Administrator, working with the Building Official, also reviews any remodel, addition, or repair to determine whether its cost triggers 'substantial improvement' status; once it does, the full flood-resistant construction standards of Section 18.51.080 apply retroactively to the whole structure, not just the new work.

Frequently Asked Questions

How high above flood level must a house be built in Redding?
At least one foot above the base flood elevation shown on the FEMA flood maps or the city's Master Storm Drain Study, whichever is higher, measured to the lowest floor including the basement and any utility equipment, under Redding Municipal Code Section 18.51.080(D)(1).
Does Redding require an elevation certificate for new construction in a flood zone?
Yes. Section 18.51.080(D)(4) requires a FEMA Elevation Certificate (Form FF-206-FY-22-152) before a building permit is issued, a foundation-elevation verification before pouring, and a second certificate at finished construction before the final permit is approved.
How much freeboard does a Redding levee need?
A minimum of three feet above the water surface of the base flood, with an additional foot required within a hundred feet of any bridge or other structure that constricts the flow, under Redding Municipal Code Section 18.51.080(G)(1)(a).

Sources & Official References

Other rules in Redding

All Redding rules

California rules heatmap·Compare Redding to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Redding, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.