Twin Falls County, ID Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard Required
- 1 foot above base flood elevation
- Utility Systems
- elevated 1 foot above BFE
- Critical Facilities
- 3 feet above BFE or 500-year flood height
- Manufactured Homes
- elevated to flood protection elevation
- Nonresidential Option
- floodproof to 1 foot above BFE, engineer certified
- Enforcing Office
- Planning and Zoning floodplain administrator
Summary
New homes and additions in Twin Falls County's flood hazard areas must sit at least one foot above the base flood elevation, the county's built-in freeboard margin above FEMA's 100-year flood line. County Code section 8-19-8 also requires elevated utility systems and flood-resistant materials below that line.
1. Residential Construction: a. New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated one foot (1') or more above the base flood elevation (BFE). ... ... d. Any building utility systems shall be elevated one foot (1') above the BFE.
Full Breakdown
Twin Falls County's freeboard standard lives in section 8-19-8(G), the specific standards subsection of the flood hazard reduction chapter that applies once base flood elevation data exists for a site. New residential construction and substantial improvements must have the lowest floor, including any basement, at least one foot above the base flood elevation, and any building utility system serving that structure must sit at the same one-foot margin above BFE. Nonresidential buildings get an alternative: elevate one foot above BFE the same way, or floodproof to that height with a design an Idaho-registered engineer or architect certifies to the floodplain administrator.
The county's own defined flood protection elevation in section 8-19-4 shows how that freeboard stacks: base flood elevation, plus any rise caused by floodway encroachment, plus the one foot of freeboard, and manufactured homes placed in a special flood hazard area must reach that full flood protection elevation, not merely the BFE. Fully enclosed areas below the elevated lowest floor, such as crawl spaces, must have flood vents sized at one square inch of opening per square foot of enclosed area, with the lowest opening no higher than one foot above grade, so hydrostatic pressure equalizes automatically.
Critical facilities like schools, hospitals, and emergency response buildings face a stricter three-foot margin above BFE, or must reach the 500-year flood height if that is higher, reflecting the county's judgment that even a slight flood risk to those uses is unacceptable.
Violations & Fines
Twin Falls County treats a lowest floor built below the required freeboard elevation as a permit violation under section 8-19-5(C), a misdemeanor exposing the owner to civil or criminal penalties, injunctions, and other lawful enforcement the county chooses to pursue. Building utility systems installed below the one-foot BFE margin can also drive up flood insurance premiums even where a formal citation never issues, and crawl spaces that skip the required flood vents lose their exemption from being classified as a basement, raising insurance costs further.
Frequently Asked Questions
How much freeboard does Twin Falls County require above the base flood elevation?
What is the flood protection elevation in Twin Falls County?
Do commercial buildings get the same one-foot freeboard requirement?
Sources & Official References
Other rules in Twin Falls County