Annapolis, MD Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Annapolis, MD, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit authority
- Director of Planning and Zoning
- Permit deadline
- Work must start within 180 days
- Elevation standard
- Lowest floor at flood protection elevation
- Appeal window
- 15 days to Building Board of Appeals
- Penalty
- Municipal infraction, daily fine after deadline
Summary
Any development or construction in a special flood hazard area within Annapolis requires a floodplain permit from the Department of Planning and Zoning before work begins.
It shall be unlawful for any person to begin any development or construction which is wholly within, partially within, or in contact with any flood hazard area established in Section 1.5, including but not limited to: Filling; grading; construction of new structures; the substantial improvement of buildings or structures, including repair of substantial damage; placement or replacement of manufactured homes, including substantial improvement or repair of substantial damage of manufactured homes; erecting or installing a temporary structure, or alteration of a watercourse, until a permit is obtained from the City of Annapolis. No such permit shall be issued until the requirements of this chapter have been met.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2025 Update 2).
Full Breakdown
Annapolis City Code Chapter 17.11 makes it unlawful to begin filling, grading, new construction, substantial improvement, manufactured-home placement, or watercourse alteration in a special flood hazard area without a City permit. The Director of Planning and Zoning, as Floodplain Administrator, reviews applications, requires elevation to the flood protection elevation (or floodproofing for nonresidential buildings), enforces flood protection setbacks along nontidal waters, and can require an MDE permit before city approval. Permits expire if work has not started within 180 days. Denials or orders may be appealed to the Building Board of Appeals within fifteen days.
Violations & Fines
Building or developing in a flood hazard area without a permit is a municipal infraction with a fine set by City Council resolution; each day after the remedial deadline is a separate offense.
Frequently Asked Questions
Do I need a permit to build in an Annapolis flood zone?
What happens if I build in a flood zone without a permit?
Sources & Official References
Other rules in Annapolis
Compare Annapolis to another location·View the Maryland environmental rules overview