Decatur, GA Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Decatur, GA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Governing law
- UDO Sec. 9.5, Floodplain Management/Flood Damage Prevention
- FIS effective date
- August 15, 2019
- No-rise standard
- 0.01 foot maximum increase in flood elevation
- Floodway rule
- encroachment banned except bridges, culverts, utilities
- Civil penalty
- up to $1,000 per day unremedied
- Criminal penalty
- up to $1,000 fine or 60 days jail
- Administering official
- UDO Administrator, Public Works Department
Summary
Any development inside a Decatur, Georgia, Area of Special Flood Hazard needs a floodplain permit before work starts, under UDO Sec. 9.5.4. The UDO Administrator reviews the site plan, elevation data and FEMA studies, and bars new construction that would raise the base flood elevation by even 0.01 foot.
No owner or developer shall perform any development activities on a site where an Area of Special Flood Hazard or Area of Future-conditions Flood Hazard is located without first meeting the requirements of this Section prior to commencing the proposed activity. ... No development shall be allowed within any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard that could result in any of the following:a.Raising the base flood elevation or future-conditions flood elevation equal to or more than 0.01 foot;b.Reducing the base flood or future-conditions flood storage capacity;c.Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the downstream boundaries of the development area; ord.Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 28).
Full Breakdown
UDO Sec. 5 applies citywide and is keyed to the Flood Insurance Study dated August 15, 2019, plus the corresponding DeKalb County FIS for annexed land, both adopted by reference in Sec. D. Before any development activity on a site with an Area of Special Flood Hazard or Area of Future-Conditions Flood Hazard, Sec. A requires an application to the UDO Administrator including a floodplain management/flood damage prevention plan with site elevations, building corner spot elevations, drainage plans, and base and future-conditions flood elevations certified by a licensed engineer or surveyor.
Sec. 01 foot or more, reduce flood storage capacity, or change flow depth and velocity at the site's upstream or downstream boundaries, and any allowed encroachment must compensate for lost storage on the same property. Sec. E prohibits fill, new construction or substantial improvements within the regulatory floodway outright, with a narrow exception for bridges, culverts, roadways and utilities backed by an engineer's hydraulic analysis showing no increase in flood elevations. Variances go to the Zoning Board of Appeals under Sec. 7 and cannot be granted within a designated floodway if they would raise flood levels.
Violations & Fines
The UDO Administrator can issue a stop-work order, withhold a certificate of occupancy, or suspend, revoke or modify the development permit until remedial measures are taken. Continued noncompliance draws civil penalties up to $1,000.00 per day, and intentional and flagrant violations can bring a criminal citation to municipal court with a fine up to $1,000.00 or up to 60 days imprisonment under UDO Sec. 9.5.8.
Frequently Asked Questions
Do I need a permit to build in a Decatur, GA flood zone?
Can a project raise the flood level for neighbors in Decatur?
Are floodway encroachments ever allowed in Decatur?
Sources & Official References
Other rules in Decatur
Compare Decatur to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.