Greenburgh, NY Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Greenburgh, NY, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit administrator
- Town Engineer
- Application fee
- $250
- Possible review deposit
- Up to $500
- FIRM effective date
- September 28, 2007
- Chapter adopted
- 8-15-2007, L.L. No. 9-2007
- Max penalty
- $250 fine or 15 days jail per day
Summary
Greenburgh requires a floodplain development permit before any construction, filling, grading or excavation in an area of special flood hazard shown on the Town's FEMA Flood Insurance Rate Maps. The Town Engineer, acting as local administrator, reviews every application and can deny or condition approval to keep new development out of harm's way.
A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and ensuring that new development is constructed in a manner that minimizes its exposure to flooding. It shall be unlawful to undertake any development in an area of special flood hazard, as shown on the Flood Insurance Rate Map enumerated in § 220-3B, without a valid floodplain development permit.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4570580; v39 updated 2025-10-22; through 10-22-2025).
Full Breakdown
L. No. 9-2007 and covers all areas of special flood hazard identified on the Town's FEMA panels (Community Number 360911, FIRM effective September 28, 2007) plus later Letters of Map Revision for the Saw Mill River corridor. Section 220-4 designates the Town Engineer as local administrator and makes it unlawful to undertake development, including manufactured home and recreational vehicle parks, subdivisions and watercourse alterations, in a special flood hazard area without a valid floodplain development permit. Applications must show elevations, dimensions, drainage facilities and material storage, and must be accompanied by a $250 fee; the administrator may also require a deposit of up to $500 to cover extra review, inspection and approval costs.
Applicants for structures with basements or lowest floors in Zones A1-A30, AE or AH must submit as-built elevation certificates from a licensed engineer or surveyor once the lowest floor is complete, and nonresidential floodproofing requires a certified floodproofing elevation. The local administrator reviews for compliance with the construction standards in § 220-5, can require technical analyses showing a project will not damage neighboring property, notifies FEMA and the state DEC before any watercourse alteration, and issues stop-work orders for unpermitted or noncompliant work. Occupancy of any flood-hazard structure is unlawful until the administrator issues a certificate of compliance based on inspections and submitted elevation or floodproofing certificates.
Violations & Fines
Building without a permit, ignoring a stop-work order, or occupying a structure without a certificate of compliance is a violation of § 220-3D punishable by up to $250 per offense or 15 days' imprisonment, or both, with each day of noncompliance a separate offense. Noncompliant structures without an approved § 220-6 variance are reported to FEMA.
Frequently Asked Questions
Do I need a permit to build in a Greenburgh flood zone?
How much does a Greenburgh floodplain permit cost?
What happens if I build in a flood zone without a permit?
Sources & Official References
Other rules in Greenburgh
New York rules heatmap·Compare Greenburgh to another location·View the New York environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.