FEMA flood zone rules in Oro Valley, AZ β also called floodplain regulations or special flood hazard area (SFHA) rules β determine flood insurance requirements and elevation standards for new construction.
Oro Valley participates in the NFIP and enforces floodplain rules exceeding FEMA minimums. Development along Canada del Oro Wash requires floodplain use permits and 1-foot freeboard.
The Town of Oro Valley Floodplain Management Ordinance governs development in FEMA-designated Special Flood Hazard Areas (Zone A, AE, AO, and AH) along the Canada del Oro Wash, Big Wash, and numerous tributary washes throughout the Town. A Floodplain Use Permit is required for any construction, fill, or grading within a regulatory floodplain. Residential structures must have the lowest floor elevated at least one foot above base flood elevation (BFE), exceeding the FEMA minimum of at or above BFE. Substantial improvement or substantial damage (exceeding 50 percent of market value) triggers full compliance with current floodplain standards. The Town adopted erosion hazard setback requirements that prohibit structures within a calculated lateral erosion distance of wash banks. Pima County Regional Flood Control District provides technical review for projects within regional floodplains. Elevation certificates are required before certificate of occupancy for structures in flood zones.
Construction in a floodplain without a Floodplain Use Permit is subject to stop-work orders, mandatory removal, fines up to $2,500 per day, and potential loss of flood insurance eligibility for the community.
Oro Valley, AZ
Oro Valley does not have a standalone leaf blower ordinance. Leaf blower use is regulated under the general noise nuisance provisions of Town Code Chapter 9....
Oro Valley, AZ
Oro Valley regulates outdoor music under its general nuisance ordinance (Town Code Chapter 9) and through special event permit conditions. Outdoor music at r...
Oro Valley, AZ
Oro Valley regulates construction noise through its zoning code and general nuisance provisions. Construction is generally permitted Monday through Saturday ...
Oro Valley, AZ
Oro Valley regulates industrial and commercial noise through its Zoning Code Chapter 22, which establishes performance standards for noise in different zonin...
Oro Valley, AZ
Retaining walls over 4 ft exposed height require a building permit with PE-stamped engineering. Surcharge walls need permits at any height. Hillside Developm...
Oro Valley, AZ
Zoning Code Ch. 23 requires fences in good repair, prohibits barbed and razor wire in residential zones, and restricts electrified fences to agricultural are...
Side-by-side rule comparisons with other cities in Pima County.
See how other cities in Pima County handle flood zones.
See how Oro Valley's flood zones rules stack up against other locations.
Quick Compare
Help us keep this page accurate. If you notice an error or outdated information, let us know.