Skip to main content
CityRuleLookup

Temple, TX Environmental Rules: Flood Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Temple, TX, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required
Floodplain development permit
Residential elevation
1 ft above base flood elevation
Administrator
City Engineer
Fine range
$200–$500 per day
Offense class
Class C misdemeanor

Summary

Temple requires a floodplain development permit before any construction, fill, or land alteration in a special flood hazard area.

In a special flood hazard area, no structure may be constructed, located, extended, converted, or altered or have its use changed, nor may land in a special flood hazard area be altered, have its use changed, or be developed, unless a floodplain development permit has been issued, pursuant to the terms of this Chapter.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Reformat).

Full Breakdown

In special flood hazard areas, no structure may be built, altered, or have its use changed, and no land may be developed, without a floodplain development permit from the City Engineer acting as Floodplain Administrator. New and substantially improved residential structures must have the lowest floor elevated at least one foot above base flood elevation, certified by a registered engineer, architect, or surveyor. Non-residential structures must meet the same elevation standard or be floodproofed and watertight to that height.

Violations & Fines

Violating any requirement of the flood damage prevention chapter is a Class C misdemeanor; each day a violation continues is a separate offense, fined between $200 and $500 per offense.

Frequently Asked Questions

Do I need a permit to build in Temple's floodplain?
Yes. Any construction, alteration, fill, or land-use change in a special flood hazard area requires a floodplain development permit from the City Engineer.
How high must a new house be built above flood level in Temple?
The lowest floor, including any basement, must be elevated at least one foot above the base flood elevation.

Sources & Official References

Other rules in Temple

All Temple rules

Texas rules heatmap·Compare Temple to another location·View the Texas environmental rules overview

Get notified when Flood Zones in Temple, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Zones in Nearby Cities

How other cities in Bell County handle flood zones.

Killeen, TX
Some Restrictions