Hartford, CT Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Runoff standard
Cannot exceed pre-development peak rates
Design manuals required
CT DOT + CT Stormwater Quality Manual
Plan trigger
Required with most zoning permits
Citation
Zoning Regulations § 6.14.2

Summary

No Hartford zoning permit, including for a parking lot, can allow untreated runoff to discharge directly into waterways, peak storm flows that exceed pre-development rates, or more than minimal disturbance of natural drainage patterns.

A.Basic Requirements. In no case shall a zoning permit, including a zoning permit for a parking lot, allow the following:(1)Direct channeling of untreated surface water runoff into adjacent ground and surface waters.(2)Peak runoff discharge rates from 2, 10, 25, and 100-year storms to exceed the corresponding pre-development peak discharge rates.(3)Disturbance of pre-development natural hydrologic conditions other than in a minimal way, unless absolutely necessary or unless pre-development conditions are restored post-development.

Full Breakdown

Zoning Regulations § 6.14.2 bars the zoning administrator from issuing any zoning permit, parking lot permits included, that would let a project discharge untreated stormwater directly into adjacent waters, exceed pre-development peak runoff rates for the 2-, 10-, 25-, and 100-year storms, or disturb pre-development drainage patterns beyond a minimal amount without restoring them. Projects must design stormwater systems to the Connecticut DOT Drainage Manual and Connecticut Stormwater Quality Manual, and most non-exempt projects seeking a zoning permit must submit a stormwater management plan reviewed against these criteria before approval (§ 6.14.2.B-C).

Violations & Fines

A zoning permit issued in violation of these stormwater limits, or site work that departs from the approved plan, is a zoning violation: the city can revoke the permit, stop work, and fine up to $250/day (§ 1.4.2, § 1.4.6).

Frequently Asked Questions

Does Hartford require a stormwater plan for new development?
Yes: most projects seeking a zoning permit must submit a stormwater management plan meeting § 6.14.2's criteria, unless exempted, such as a single detached home not part of a larger development.
Can a Hartford project increase runoff onto neighboring property?
No, § 6.14.2.A bars any zoning permit that would let peak runoff discharge rates exceed pre-development rates for the 2- through 100-year storms.

Sources & Official References

Other rules in Hartford

All Hartford rules

Compare Hartford to another location·View the Connecticut environmental rules overview

Get notified when Stormwater Management in Hartford, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.