Jersey City, NJ Environmental Rules: Stormwater Management (2026)
Key Facts
- Applicability trigger
- 1,000+ sq ft new/altered impervious surface, >50% of site
- Minor Development retention
- 0.6 gallons per sq ft of impervious surface
- TSS removal, Major Development
- 80%; 95% within 300-ft riparian buffer
- Water quality design storm
- 1.25 inches of rain in two hours
- Cure period before penalty
- 14 days after written notice
- Enforcing agency
- City of Jersey City / JCMUA
Summary
Jersey City requires Major and Minor Developments that add, replace, or disturb 1,000 or more square feet of impervious surface to control stormwater runoff quality, quantity, and groundwater recharge under City Code § 345-74. The ordinance targets combined sewer overflows into the Hudson River and its tributaries, and no development wins municipal approval without a written technical-review finding of compliance from a qualified city official.
It is the purpose of this section to establish minimum Stormwater management requirements and controls for "Major Development" and "Minor Development" as defined in Section 2 of this section. The environmental objectives of these requirements are to reduce pollution from municipal Separate Sewer Systems, direct discharges to surface waters, and CSO events; to reduce flooding and streambank Erosion; and promote rainwater harvesting for re-use on-site. ... This section shall apply to all Major and Minor Developments as defined in Section 2. ... Where Development that adds, replaces, or disturbs, alone or in combination, 1,000 or more square feet of Impervious Surface results in an alteration to more than 50 percent of regulated Impervious Surface and/or Regulated Motor Vehicle Surface of a previously existing Development, the entire existing Development shall meet the requirements of this article.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 52).
Full Breakdown
Article VI of the Jersey City Code, codified at § 345-74 (Stormwater Control), responds directly to the city's combined sewer system: storm and sanitary flows share the same pipes, and heavy rain routinely overwhelms capacity, triggering combined sewer overflow (CSO) events that dump untreated sewage into nearby waterways. Section 1 states the ordinance exists to cut pollution from CSOs and separate sewer discharges, reduce flooding and streambank erosion, and promote on-site rainwater reuse. a sets the applicability trigger: any development that adds, replaces, or disturbs 1,000 or more square feet of impervious surface, where that work alters more than 50 percent of a site's existing impervious or regulated motor-vehicle surface, must bring the entire existing development into compliance, not just the new work.
A. 4:24-39) and mandates green infrastructure, bioretention, pervious pavement, green roofs and similar practices tabled in Section 5, for groundwater recharge, runoff quantity, and runoff quality. 25 inches of rain in two hours), rising to 95 percent removal for discharges within a 300-foot riparian buffer of Category One waters. Section 9 caps post-construction peak runoff for the two-, ten- and 100-year storms at or below pre-construction rates. 6 gallons of stormwater retained on-site per square foot of impervious surface. D exempts underground utility lines, improved above-ground utility lines, and pedestrian paths up to 14 feet wide built of permeable material.
2, until a city official issues written findings after technical review, through a Site Development Stormwater plan under Section 14 that the Jersey City Municipal Utilities Authority (JCMUA) helps review.
Violations & Fines
Under Section 16, anyone who erects, alters, or maintains a building, structure, or land in violation of the stormwater ordinance, or who disobeys any JCMUA or city order enforcing it, gets 14 days after written notice to abate. Refusal makes each additional day a separate violation without further notice, punishable under Chapter 1, General Provisions. The JCMUA may also withhold water meters until the property complies.
Frequently Asked Questions
Does a small home renovation trigger Jersey City's stormwater rules?
What happens if a project ignores the stormwater ordinance?
Can a development get a waiver from the recharge or runoff standards?
Sources & Official References
Other rules in Jersey City