Key Facts

Ordinance adopted
June 18, 2015
Applies to
Unincorporated Champaign County only
Permit trigger
1+ acre of land disturbance (ILR10)
Enforcing official
County Zoning Administrator
Fine range
$100 to $500 per day, per offense
Program
NPDES MS4 stormwater compliance

Summary

Champaign County's Storm Water Management and Erosion Control Ordinance, adopted June 18, 2015, bars grading or filling that ponds surface water or turns runoff into a nuisance, requires all storm water to leave a development site at non-erosive velocities, and triggers a state ILR10 permit once land disturbance reaches one acre. It reaches unincorporated county land only.

These county ordinances apply to unincorporated areas of Champaign County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A. No FILL shall be placed nor GRADE altered in such a manner that it will cause SURFACE WATER upstream of the DEVELOPMENT to pond or direct surface flows in such a way as to create a nuisance. B. All STORM WATER shall exit the DEVELOPMENT at non-erosive velocities. All subsurface flows shall exit the DEVELOPMENT at such a velocity so as to prevent an increase in scouring or structural damage to off-site tile drains. C. Sizing of CULVERT crossings shall consider entrance and exit losses as well as tail water conditions on the CULVERT.

Full Breakdown

1, General Requirement, is the operative drainage standard: no fill may be placed nor grade altered so that surface water upstream of a development ponds or is directed to create a nuisance, storm water must exit a development at non-erosive velocities so subsurface flows do not scour or damage off-site tile drains, and culvert crossings must be sized accounting for entrance and exit losses and tail-water conditions. 0, Applicability, folds in the Illinois EPA's ILR10 general permit: it applies once land disturbance activities reach one acre or more, or less than an acre if the site is part of a common plan of development that ultimately disturbs an acre or more, including individual lots created out of such a plan.

The ordinance implements Champaign County's National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) program. 1 and Section 10 of the County Zoning Ordinance, read together with the Land Disturbance Erosion Control standards in Section 11 of this Ordinance. Because county zoning and this drainage ordinance reach the unincorporated area only, land inside Champaign, Urbana, Rantoul, Savoy or Mahomet is governed by that city's own stormwater program, not this county text.

Violations & Fines

Under Section 15.7, Legal Proceedings, a complaint for any violation may be filed in the Circuit Court, with each day a violation exists counted as a separate offense; the State's Attorney may also seek an injunction or a lien for cleanup costs. Section 15.8, Penalties, sets the fine at not less than $100 nor more than $500 per day for each separate offense. The Zoning Administrator can also post a stop-work order under Section 15.6, and after 10 days may enter the site and perform corrective erosion and sediment control work, billing the cost to the owner or permittee.

Frequently Asked Questions

Does this stormwater ordinance apply inside the City of Champaign or Urbana?
No. Champaign County's zoning and drainage authority under this ordinance reaches unincorporated county land only. Property inside Champaign, Urbana, Rantoul, Savoy or Mahomet falls under that municipality's own separate stormwater code, not the county ordinance.
When does a Champaign County stormwater permit become required?
Section 4.0 ties the requirement to the state ILR10 general permit: it applies once land disturbance reaches one acre or more, or a smaller lot that is part of a common development plan ultimately disturbing an acre or more.
Can I let runoff pond on my neighbor's land during grading?
No. Section 6.1(A) prohibits placing fill or altering grade in a way that causes surface water upstream of the development to pond or that directs flows so as to create a nuisance for adjoining land.
What happens if I violate the stormwater ordinance in unincorporated Champaign County?
The Zoning Administrator can issue a stop-work order, and the State's Attorney can file in Circuit Court. Section 15.8 sets a fine of $100 to $500 per day, with each day of ongoing violation charged as a separate offense.

Sources & Official References

Other rules in Champaign County

All Champaign County rules

Compare Champaign County to another location·View the Illinois environmental rules overview

Get notified when Stormwater Management in Champaign County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.