Marathon County, WI Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
Unincorporated county land only
Approval needed
DNR + Commissioner/town engineer
Governing chapter
Ch. 18, Land Division Code
Excluded
Wausau, Mosinee, Rothschild, other cities

Summary

Marathon County requires every major subdivision built on unincorporated land to have its stormwater management plan approved by the DNR and county or town engineer, using facilities like retention ponds or infiltration trenches, before final plat approval.

City-specific rules exist: Rothschild, and Wausau have their own stormwater management rules that differ from Marathon County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

18.008.03.Stormwater management requirements.A.The design and construction of stormwater management facilities shall require the review and approval of the DNR, Commissioner and town engineer if applicable, in accordance with all other applicable laws and regulations.1.Allowable types of stormwater management facilities include but are not limited to:a.Retention ponds.b.Detention basins.c.Underground storage tanks.d.Rooftop storage areas.e.Parking lot storage areas.f.Infiltration trenches/recharge ditches.g.Swales/buffer strips...

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 59).

Full Breakdown

Marathon County's Land Division and Surveying Code (Chapter 18) requires major subdivisions to submit a stormwater management plan for review and approval by the DNR, the County Commissioner, and the town engineer where applicable. Acceptable facility types include retention ponds, detention basins, underground storage tanks, rooftop or parking-lot storage, infiltration trenches, and buffer swales. The code applies only to unincorporated Marathon County land under Section 18.001.04: it does not reach inside Wausau, Mosinee, Rothschild or the county's other incorporated cities and villages, and a town's own subdivision ordinance controls if it is more restrictive than the county's.

Violations & Fines

Final plat approval can be withheld if a developer hasn't complied with the approved stormwater and soil erosion control plan in any prior phase, under Section 18.009.05, until the deficiency is fixed.

Frequently Asked Questions

Does Marathon County's stormwater rule apply in Wausau or Mosinee?
No. Chapter 18 governs only unincorporated county land; Wausau, Mosinee, Rothschild and the county's other cities and villages enforce their own separate stormwater ordinances.
What stormwater facilities does the county code accept?
Retention ponds, detention basins, underground storage tanks, rooftop or parking-lot storage, infiltration trenches, and buffer swales are listed as acceptable design options under Section 18.008.03.

Sources & Official References

Other rules in Marathon County

All Marathon County rules

Compare Marathon County to another location·View the Wisconsin environmental rules overview

Get notified when Stormwater Management in Marathon County, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across Marathon County