Rothschild, WI Environmental Rules: Stormwater Management (2026)
Key Facts
- Enforcing office
- Administrator of Public Works
- TSS cut, new development
- 80% reduction required
- TSS cut, redevelopment/early infill
- 40% reduction required
- Peak flow control
- 2-, 10-, 100-year storms
- Permit review time
- 20 business days
- Maintenance agreement
- Recorded with County Register of Deeds
- Penalty
- $10-$500 first offense, per day
Summary
New development in Rothschild must cut post-construction runoff pollution by 80 percent and control peak flows for the 2-, 10- and 100-year storm before a post-construction runoff permit issues from the Administrator of Public Works under Village Code Sections 590-51 and 590-52.
Total suspended solids. BMPs shall be designed, installed and maintained to control total suspended solids carried in runoff from the post-construction site as follows: ... For new development, by design, reduce to the maximum extent practicable the total suspended solids load by 80%, based on the average annual rainfall, as compared to no runoff management controls. No responsible party/person shall be required to exceed an eighty-percent total suspended solids reduction to meet the requirements of this subsection. ... By design, BMPs shall be employed to maintain or reduce the peak runoff discharge rates, to the maximum extent practicable, as compared to predevelopment, conditionally the two-, ten- and one-hundred-year, twenty-four-hour design storm applicable to the post-construction site. ... No responsible party may undertake a land disturbing construction activity without receiving a post-construction runoff permit from the Administrator of Public Works, or the designee, prior to commencing the proposed activity.
Full Breakdown
Chapter 590, Article IV regulates long-term stormwater separately from short-term construction erosion. Section 590-51 sets numeric performance standards for the stormwater management plan every post-construction site must implement: BMPs must reduce total suspended solids by 80% for new development, by 40% for redevelopment and for infill under five acres built within 10 years of October 1, 2002, and by 80% for infill built after that window, all measured against no controls at average annual rainfall. Peak discharge rates must be held at or below predevelopment levels for the 2-, 10- and 100-year, 24-hour design storms, and infiltration BMPs must capture 90% of predevelopment infiltration volume for residential sites and 60% for commercial, industrial and institutional sites, with narrower alternative percent-of-runoff tests available.
Protective, largely undevelopable buffers of 10 to 75 feet apply along the top of channel or wetland boundary depending on water type. Section 590-52 requires a post-construction runoff permit from the Administrator of Public Works before any land disturbing activity begins; the application needs the stormwater management plan, a maintenance agreement, and a nonrefundable permit administration fee, and the Administrator has 20 business days to approve or deny a complete application. The maintenance agreement must be recorded with the Marathon County Register of Deeds as a running deed restriction.
Enforcement under Section 590-57 covers this article: a certified-mail notice of violation, a stop-work order, permit revocation, and referral to the Village Attorney are all available before a court injunction is sought.
Violations & Fines
Section 590-57 makes any noncomplying post-construction runoff a violation once the Administrator of Public Works gives written notice by certified mail describing the defect and the correction schedule. Noncompliance carries a forfeiture of not less than $10 nor more than $500 for a first offense and not less than $50 nor more than $500 for a second, with each day of violation a separate offense, plus costs of prosecution and possible injunction.
Frequently Asked Questions
Does every construction project in Rothschild need a stormwater permit?
How much stormwater pollution reduction does new construction need in Rothschild?
Who maintains stormwater controls after construction is done?
What happens if a developer ignores Rothschild's stormwater rules?
Sources & Official References
Other rules in Rothschild
Compare Rothschild to another location·View the Wisconsin environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.