Oneida, NY Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 143-22
Design standard
"Best available technology" required
Storm sizing
2-, 10- and 100-year, 24-hour events
Reviewing body
Joint Zoning Board of Appeals/Planning Commission
Discharge limit
Post-construction cannot exceed pre-construction rate

Summary

The City of Oneida, Madison County, New York requires every site plan reviewed under City Code Chapter 143 to include a stormwater management design that meets Section 143-22's environmental engineering standard. Design must use the best available technology to cut off-site runoff, boost on-site infiltration, and keep pollutants out of groundwater and surface water, with system strategy and sizing subject to City specifications.

§ 143-22. Stormwater management. A. General. (1) Design of the stormwater management system shall be consistent with general and specific concerns, values, and standards of the City's Comprehensive Plan and applicable county, regional, and state storm drainage control programs, including Mosquito Commission Control Standards, if applicable. Design shall be based on environmentally sound site planning and engineering techniques. (2) The best available technology shall be used to minimize off-site stormwater runoff, increase on-site infiltration, encourage natural filtration functions, simulate natural drainage systems, and minimize off-site discharge of pollutants to groundwater and surface water. Best available technology may include measures such as retention basins, recharge trenches, porous paving and piping, contour terraces, and swales. B. System strategy and design. Stormwater management system strategy and design shall comply with City specifications.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4996966; v33 updated 2026-07-07; through 07-07-2026).

Full Breakdown

Section 143-22, Stormwater management, sits in Chapter 143's Article V, Special Procedures and Standards, and applies to every development that requires site plan approval under Section 143-9, meaning new construction, qualifying additions, and nonresidential or multifamily projects across the City's zoning districts. (1) ties stormwater design to the City's Comprehensive Plan and to applicable county, regional, and state storm drainage control programs, including Mosquito Commission Control Standards, and requires environmentally sound site planning and engineering techniques. (2) sets the performance standard: the developer must use the best available technology to minimize off-site runoff, increase on-site infiltration, encourage natural filtration, simulate natural drainage, and minimize off-site discharge of pollutants, naming retention basins, recharge trenches, porous paving and piping, contour terraces and swales as acceptable measures.

Subsection B leaves the specific engineering strategy and design to City specifications reviewed by the City Engineer. The Article VI document-specification rules that implement Section 143-22 also require, in the stormwater management report provisions immediately preceding it, storage and discharge calculations sized to two-year, ten-year and one-hundred-year, twenty-four-hour storm events, and a statement of whether a New York State Department of Environmental Conservation dam permit applies. Post-construction peak discharge rates may not exceed pre-construction rates. The Joint Zoning Board of Appeals/Planning Commission reviews these submissions as part of the site plan approval Sections 143-8 and 143-9 require, and the City Engineer signs off on the specific facility design and sizing before a permit issues.

Violations & Fines

Chapter 143 does not print its own stormwater-specific fine; a project that fails to submit an adequate stormwater management design under Section 143-22 simply cannot receive the site plan approval Section 143-9 requires, so the Joint Zoning Board of Appeals/Planning Commission can withhold or condition approval, and the City Engineer can require redesign before construction proceeds.

Frequently Asked Questions

What stormwater standard applies to new development in Oneida?
City Code Section 143-22 requires site plans to use "the best available technology" to minimize off-site runoff and pollutant discharge, listing retention basins, recharge trenches, porous paving, contour terraces and swales as acceptable measures, and ties the design to the City's Comprehensive Plan and county and state drainage programs.
Who reviews a stormwater management plan in Oneida?
The Joint Zoning Board of Appeals/Planning Commission reviews stormwater management as part of the site plan approval process under Chapter 143, with the City Engineer approving the specific system strategy and design, which Section 143-22.B requires to comply with City specifications.
Is there a discharge rate limit for new construction?
Yes. The Article VI document specifications tied to Section 143-22 require that post-construction peak discharge rates not exceed pre-construction discharge rates, and developers must size facilities to withstand two-year, ten-year and one-hundred-year, twenty-four-hour storm events before the City will approve a site plan.

Sources & Official References

Other rules in Oneida

All Oneida rules

New York rules heatmap·Compare Oneida to another location·View the New York environmental rules overview

Get notified when Stormwater Management in Oneida, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.