Skip to main content
CityRuleLookup

Pima County, AZ Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
Unincorporated Pima County new development
Standard
Storm Water Detention/Retention Manual
Alternative
Fee in lieu of detention, chief engineer approval
Approving official
Pima County chief engineer

Summary

New development in unincorporated Pima County must reduce peak or volumetric storm water runoff, using the county's Storm Water Detention/Retention Manual, unless a fee in lieu is approved.

City-specific rules exist: Sahuarita, and Tucson have their own stormwater management rules that differ from Pima County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

Any new development shall provide some method of peak or volumetric runoff reduction, unless fees in lieu of detention are proposed pursuant to Section 16.48.040 and approved by the chief engineer. The amount of reduction is stipulated within the Storm Water Detention/Retention Manual. The peak runoff reduction should be provided through detention of storm water and storm water harvesting for supplemental irrigation, where possible. The Storm Water Detention/Retention Manual, approved for use by the board, or other applicable engineering standards for storm water control and/or storm water harvesting that is approved by the chief engineer shall be used for design. Any revisions to the Storm Water Retention/Detention Manual will be reviewed by the flood control district advisory committee, prior to adoption by the board as updated design standards for detention/retention. (Ord. 2010-FC5 § 1 (part), 2010; Ord. 2005 FC-2 § 2 (part), 2005; Ord. 1999 FC- 1 § 1 (part), 1999; Ord. 1988 FC-2 Art. 14 (part), 1988)

Source: Pima County Regional Flood Control DistrictView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-64: Contains Supplement, with local legislation through Ordinance 2026-9, passed 7-28-2026, current through 7-28-2026).

Full Breakdown

Any new development in the unincorporated county must provide some method of peak or volumetric runoff reduction, unless the developer proposes and the chief engineer approves fees in lieu of detention instead. The required amount of reduction follows the county's Storm Water Detention/Retention Manual, and peak runoff reduction should be achieved through storm water detention or harvesting for supplemental irrigation where possible.

Violations & Fines

Developing without providing runoff detention or an approved fee-in-lieu arrangement violates Pima County Code Chapter 16.48; the county can withhold approval of the development plan until a compliant detention or retention design is submitted.

Frequently Asked Questions

Can I pay a fee instead of building a detention basin in unincorporated Pima County?
Only if the chief engineer approves a fee in lieu of detention under Section 16.48.040; otherwise a runoff reduction method is required.
What standard sets the required runoff reduction amount?
The county's Storm Water Detention/Retention Manual, approved by the Board of Supervisors.

Sources & Official References

Other rules in Pima County

All Pima County rules

Compare Pima County to another location·View the Arizona environmental rules overview

Get notified when Stormwater Management in Pima County, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across Pima County