Summary

In unincorporated Sampson County, new subdivisions must be designed and built to comply with NCDEQ stormwater requirements, and every NCDEQ permit, including an Erosion and Sedimentation Control permit, must accompany the Final Plat under County Code Sec. 2-13-11. If stormwater facilities are not yet installed when the Final Plat is approved, the subdivider must post a Performance Guarantee covering their completion, released only after an engineer certifies the work.

These county ordinances apply to unincorporated areas of Sampson County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

All subdivisions shall be designed and constructed in a manner that is compliant with NCDEQ requirements as applicable. All NCDEQ permits including but not limited to an Erosion and Sedimentation Control permit must be ... provided with the Final Plat. Where stormwater management facilities are required, but not installed at the time of the Final Plat approval, the subdivider shall post a Performance Guarantee to ensure the completion of such facilities. When the facility has been completed the County will require an Engineer's certification to release the guarantee back to the subdivider. Maintenance of the stormwater facility shall be deeded to a homeowners/property owners association and this shall also be noted on the Final Plat.

Full Breakdown

Sampson County Code Sec. 2-13-11, part of the county's Subdivision Ordinance in the Land Use chapter, requires every new subdivision in unincorporated Sampson County to be designed and constructed so it complies with North Carolina Department of Environmental Quality (NCDEQ) stormwater standards. The developer must obtain and submit all applicable NCDEQ permits, including an Erosion and Sedimentation Control permit under the related requirement at Sec. 2-13-10, before the Sampson County Planning Department will approve the Final Plat. Where the subdivision's stormwater facilities, such as retention ponds or drainage structures, are required but have not yet been built when the Final Plat is approved, the subdivider must post a Performance Guarantee under Sec.

2-14, adopted pursuant to G.S. 160D-804.1, to secure completion of the work. The County will not release that guarantee back to the subdivider until a licensed engineer certifies the stormwater facility has been completed as designed. Long-term upkeep is not left to chance: the code requires maintenance of the completed stormwater facility to be deeded to a homeowners' or property owners' association, and that maintenance obligation must be noted directly on the recorded Final Plat so future lot owners are on notice. The Sampson County Planning Department reviews these submissions during subdivision approval; because the underlying permits come from NCDEQ, the county administers compliance and platting but does not itself set the technical stormwater design standards.

Violations & Fines

Building without meeting these stormwater requirements exposes the plat to rejection at the Planning Department: a Final Plat missing NCDEQ permits, including the Erosion and Sedimentation Control permit, will not be approved, and construction activity requiring those NCDEQ authorizations may not commence until they are obtained. A subdivider who fails to post or maintain the required Performance Guarantee cannot obtain the engineer's certification needed to close out the project, leaving the guarantee in place indefinitely.

Frequently Asked Questions

Does Sampson County require a stormwater permit for new subdivisions?
Yes. Sec. 2-13-11 of the Sampson County Code requires every subdivision in the unincorporated county to be designed and built in compliance with NCDEQ stormwater requirements, and all applicable NCDEQ permits must be submitted with the Final Plat before the Sampson County Planning Department will approve it.
What happens if stormwater facilities aren't finished before Final Plat approval?
The subdivider must post a Performance Guarantee under Sec. 2-14 to cover completion of the facilities. Sampson County holds that guarantee until a professional engineer certifies the stormwater facility is complete, at which point the guarantee is released back to the subdivider.
Who maintains a subdivision's stormwater facility after it's built?
Sec. 2-13-11 requires maintenance of the completed stormwater facility to be deeded to a homeowners' or property owners' association, and that obligation must be recorded on the Final Plat, so it is the HOA/POA, not Sampson County, that maintains it long-term.

Sources & Official References

Other rules in Sampson County

All Sampson County rules

Compare Sampson County to another location·View the North Carolina environmental rules overview

Get notified when Stormwater Management in Sampson County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.